To the Saga synthesis top

Traffic regulation information (October 6 15:40 update) in prefecture road

The last update date:

 

News to road user for the second damage prevention at the time of heavy rain

In Saga, a large number of damage occurs by heavy rain in July, 2018 and are canceling suspension of traffic by emergency restoration now.

When you go out as it is assumed that typhoon comes close, you have you confirm about the following things, and please be careful in future.

 

When heavy rain including typhoon is expected, we have you confirm weather prediction and road information beforehand, and the non-pivot would appreciate your refraining from non-sudden outing.

 

We go out and when we meet with heavy rain, we avoid runs such as mountain paths and hope that we have you stay in safer place by any chance.

 

[direct control national highway]

  As it is made news release about information (prior traffic regulation) of national highway which the Ministry of Land, Infrastructure, Transport and Tourism manages, please see Ministry of Land, Infrastructure, Transport and Tourism Kyushu district maintenance station homepage.

 

 About the second damage prevention at the time of heavy rain We open with the other window(external link)

 

 

The current full-scale closed point number in country, prefectural road of Saga management

■Suspension of traffic is occurring by heavy rain now in the mountains in various places throughout the prefecture in July, 2018.

 

■About information except prefecture management road, please confirm from each manager homepage.

 Full-scale closed point number by submergence, earth and sand disaster, the snow, accident

Eight places    

 

■Point, please confirm position figure No thoroughfare

        

Position figure We open with the other window(external link)

 

■Saga management road prohibits road construction of the following periods in principle

 

PDF Street construction cancellation period We open with the other window(PDF: 29.4 kilobytes)

  •  

     

     [national highway]

       Full-scale suspension of traffic by the snow, earth and sand disaster, accident
     
    (earth and sand disaster)
    • Ariake seashore bank road (Route 444) (Ashikaricho, Ogi-shi) Ashikari IC - Ashikari south IC (the down line) ※Only the down line is closed

     (shoulder collapse)

    • Route 385 (old road, Sakamoto Pass) Yoshinogari-cho side old road entrance - Fukuoka prefectural border 3.0km 

     

     

     [prefectural road]

      Full-scale suspension of traffic by the snow, earth and sand disaster, accident
      

       ・Nanatsuyama Karatsu Line (Nanayamanibu, Karatsu-shi - Hamatamamachihirabaru) Nanatsuyama Kyuuragi Line intersection - plain public hall 3.0km

         ・It is approximately 1km 1.0km to the Imari field Kyuuragi, Sendai Line (Kurogawachohanabusa, Imari-shi) Shioya Omagari Line intersection - Imari city area 

       ・Neighborhood of Sawara Nakahara station line (Miyaki-cho, Miyaki-gun) Maruyama forest road - hills and rivers golf course 1.8km

         ・Neighborhood of shingle-roofed house Kyuuragi Line (Kyuragimachimakise, Karatsu-shi) Asahigaoka housing complex 100m

       ・Neighborhood of Sugiyama Ogi Line (Fujichoichikawa, Saga-shi) mountain pass top 20m

     

    [others]

     Full-scale suspension of traffic by the snow of the neighborhood of Fukuoka prefectural border, earth and sand disaster, accident

     (earth and sand disaster)

        ・Route 263 (Fukuoka side old road, Mise Pass)
     
     

     

    Full-scale suspension of traffic except prefecture management road

    [expressway] (NEXCO West Japan management)    

      About regulation information of expressway, please see homepage of NEXCO.
    • Kyushu crossing motor vehicles roads (Nagasaki Expressway)
    • Kyushu traversing motor vehicles roads (Kyushu Expressway)
    • Nishi Kyushu Expressway

     Please see "homepage We open with the other window(external link) of NEXCO"We open with the other window

     

    [direct control national highway] (Saga national highway office management)

    (earth and sand disaster)

          ・Nishi Kyushu Expressway (Route 497) (south Hata Taniguchi IC - imanrihigashifumaneki IC) ※With both traffic lanes

     

       About regulation information of national highway which the Ministry of Land, Infrastructure, Transport and Tourism manages, please see Ministry of Land, Infrastructure, Transport and Tourism Saga national highway office homepage.

     

    Please see "Ministry of Land, Infrastructure, Transport and Tourism Saga national highway office homepage" We open with the other window(external link)

     

    ■With direct control national highway,

     Route 3, Route 34, Route 35, Route 202, Route 203, Route 497

      

     [toll road] (Saga road public corporation management)    

      About regulation information of toll road, please see homepage of Saga road public corporation.
    • Mise Tunnel toll road
    • Higashisefuri tunnel toll road
    • Kyuuragi Taku toll road

     

    Please see "Saga road public corporation homepage" We open with the other window(external link)

     


     

    Notice to portable site of regulation information

     

    Road regulation information in Saga came to be seen from cell-phone.

    As you publish in Saga prefectural government office homepage (mobile version), please use.

     

     

    We relate to this page
    Inquiry
    (ID: 11424)
    Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
    Copyright© 2016 Saga Prefecture.All Rights Reserved.

    Saga prefectural government office (corporation number 1000020410004)

    〒840-8570
    1-1-59, Jonai, Saga-shi
    Tel: 0952-24-2111 (main)
    Copyright© 2016 Saga Prefecture.All Rights Reserved.