To the Saga, Saga The Prefectural Assembly TOP synthesis topTo the Saga, Saga The Prefectural Assembly TOP synthesis top
Saga, Saga The Prefectural AssemblySaga, Saga The Prefectural Assembly (smartphone version)
Background color BlueBlackWhite
Size ExpansionNormal

February, 2016 regular assembly resolution title inspection

The last update date:

The deliberation results such as bills


The Prefectural Assembly regular in February, 2016

Resolution title table


Voting result With new window(146KB, PDF file) of each member of the Diet 

The presentation of a bill in the Diet
The date
 Bill number Matter    The name Presenter Decision
The date
Decision
Type
28.3.24 The first decision
Resolution
Relief of citizen of the prefecture, sincere posture omeru resolution (plan) of Kyushu Electric Power with safely big responsibility The Japanese Communist Party
Meeting of Kazuma

28.3.24

Rejection
Decision No. 2
Resolution
 
Resolution (plan) about the Ground Self-Defense Force deployment of Saga Airport The Liberal Democratic Party
The Komeito
Meeting of LDP, hina
sosankai
  The approval
Block addition
We relate to this page
Inquiry
(ID: 41427)
Assembly Secretariat   〒 840-8570  1-1-45, Jonai, Saga-shi  
(General Administration Division) TEL: 0952-25-7215 (Proceedings Division) TEL: 0952-25-7216 (the state affairs Security Research Division) TEL: 0952-25-7306 email (common): [email protected]

Copyright© 2016 Saga Prefecture.All Rights Reserved. Saga

Assembly Secretariat

1-1-45, Jonai, Saga-shi
(General Administration Division) TEL: 0952-25-7215
(Proceedings Division) TEL: 0952-25-7216
(the state affairs Security Research Division) TEL: 0952-25-7306
Email (common): [email protected]
Copyright© 2016 Saga Prefecture.All Rights Reserved.