To the Saga synthesis top

"Pluthermal Plan"

The last update date:
December 2, 2009 The end of Genkai third unit twelfth periodical inspection (start of pluthermal driving)
November 5, 2009 Nuclear reactor of the Genkai third unit which loaded 16 plutonium-uranium mixed oxide fuel starts
The Governer comment With new window(89KB, PDF file)
August 30, 2009 Genkai third unit twelfth periodical inspection start
May 23, 2009 Plutonium-uranium mixed oxide fuel carrier arrives at Genkai nuclear power plant
February 26, 2009 In prefecture and Genkai-cho, all right about transportation of plutonium-uranium mixed oxide fuel in advance for Kyushu Electric Power With new window(51KB, PDF file)
February 17, 2009 In the 70th Saga atomic energy environment security contact meeting, country (the Ministry of Land, Infrastructure, Transport and Tourism) and Kyushu Electric Power explain marine transportation of plutonium-uranium mixed oxide fuel
January 28, 2009 Kyushu Electric Power submits request for prior consent about transportation of plutonium-uranium mixed oxide fuel to prefecture and Genkai-cho based on safe agreement
Public announcement sentence With new window(96KB, PDF file) of the prefecture
July 28, 2008 Production of plutonium-uranium mixed oxide fuel is completed
February 1, 2008 Kyushu Electric Power announces outbreak of phenomenon using parts for examination in plutonium-uranium mixed oxide fuel manufacturing process
The Governer comment With new window(108KB, PDF file)
October 9, 2007 In French merokkusu company, production of plutonium-uranium mixed oxide fuel for the Genkai third unit starts
February 2, 2007 2 bills about request requesting establishment of "citizen of the prefecture vote by-law about the yes and no of "Pluthermal Plan" acceptance in Genkai Nuclear Power Plant" reject in the temporary The Prefectural Assembly
March 26, 2006 The Governer press conference (interview record)
All right about request for prior consent of "Pluthermal Plan" of the Genkai third unit based on "agreement about ensuring safety of nuclear power plant"
Karatsu-shi changes "confirmation of Saga and Karatsu-shi pertaining to agreement about ensuring safety of nuclear power plant" for the prefecture With new window
Talks such as the Minister of Economy Trade and Industry, Saga the Governer, Mayor Genkai
February 20, 2006 Mayor Genkai visits the Governer and conveys that we strengthened intention to understand in advance based on safe agreement.
Mayor Karatsu visits the Governer and performs offer about participation in safe driving management or local promotion and speaks that judgment of the prefecture about the prior consent understands. Offer With new window(84KB, PDF file) from Karatsu-shi
February 7, 2006 About safety of "Pluthermal Plan" in the Genkai Nuclear Power Plant third unit, we announce thought as Saga
January 18, 2006 We announce about questionnaire result of pluthermal panel discussion With new window(466KB, PDF file)
December 25, 2005 In Karatsu-shi, we hold pluthermal panel discussion hosted by the prefecture
October 14, 2005 In the government, the Atomic Energy Commission respects the university rope as basic policy about atomic energy policy about decided "atomic energy policy outline" on October 11, 2005, is cabinet decision in thing that and promote by the use researching and developing of atomic energy
October 2, 2005 Country (Ministry of Economy, Trade and Industry) holds symposium about pluthermal in Genkai-cho
September 12, 2005 Nuclear and Industrial Safety Agency and the Nuclear Safety Commission explain safe examination results pertaining to "Pluthermal Plan" of the Genkai third unit in the 63rd Saga atomic energy environment security contact meeting
September 9, 2005 Nuclear and Industrial Safety Agency and the Nuclear Safety Commission explain safe examination results pertaining to "Pluthermal Plan" of the Genkai third unit in prefectural policy review meeting
September 7, 2005 Ministry of Economy, Trade and Industry announces to hold pluthermal symposium in Genkai-cho on October 2
September 7, 2005 The Minister of Economy Trade and Industry admits nuclear reactor setting change application pertaining to "Pluthermal Plan" of the Genkai third unit which Kyushu Electric Power submitted
August 30, 2005 If judgment (primary examination result) of the Minister of Economy Trade and Industry pertaining to "Pluthermal Plan" of the Genkai third unit is proper, the Atomic Energy Commission reports for the Minister of Economy Trade and Industry
August 29, 2005 The Nuclear Safety Commission reports with validity by judgment (primary examination result) of the Minister of Economy Trade and Industry for Ministry of Economy, Trade and Industry (Nuclear and Industrial Safety Agency)
June 22, 2005 Examination committee member of the Nuclear Safety Commission is on-site inspection in the Genkai third unit
March 28, 2005 In Saga atomic energy environment security contact meeting, Nuclear and Industrial Safety Agency explains primary examination result of the Genkai third unit. Cabinet Office explains "interim report about fuel cycle policy"
March 24, 2005 Nuclear and Industrial Safety Agency explains primary examination result to the prefecture
17, Heisei two a month 20 days a month Kyushu Electric Power holds panel discussion in Genkai-cho
February 10, 2005 Ministry of Economy, Trade and Industry (Nuclear and Industrial Safety Agency) is consulted by the Atomic Energy Commission and the Nuclear Safety Commission
January 18, 2005 Kyushu Electric Power submits revision of request for prior consent to prefecture and Genkai-cho. We submit some revision of nuclear reactor setting change permission application to country
November 12, 2004 We discuss "interim report about fuel cycle" in the new plan development meeting of the Atomic Energy Commission and are decided
July 30, 2004 In Saga atomic energy environment security contact meeting, Nuclear and Industrial Safety Agency explains procedures for national security examination pertaining to "Pluthermal Plan"
May 28, 2004 Kyushu Electric Power submits nuclear reactor setting change permission application to country based on the regulation methods such as nuclear reactors. We submit request for prior consent to prefecture and Genkai-cho based on safe agreement.
May 20, 2004 In Saga atomic energy environment security contact meeting, Agency for Natural Resource and Energy and Kyushu Electric Power each explain energy policy, fuel cycle and "Pluthermal Plan"
May 14, 2004  In the prefectural policy review meeting, Kyushu Electric Power explains "Pluthermal Plan"
May 13, 2004 In the prefectural policy review meeting, Ministry of Economy, Trade and Industry (the Agency for Natural Resource and Energy) explains "energy policy and fuel cycle"
May 12, 2004 The Governer requests Senior Vice Minister of Economy, Trade and Industry Izumi for energy policy, explanation about fuel cycle policy
April 28, 2004 It is explained by the prefecture that Kyushu Electric Power is going to carry out pluthermal in the Genkai Nuclear Power Plant third unit
Notification, "we decided policy to enforce pluthermal in the Genkai Nuclear Power Plant third unit in today's board of directors" from Kyushu Electric Power Co., Inc.
December 19, 2003 Federation of Electric Power Companies announces the situation of each electric company for "Pluthermal Plan"
February 21, 1997 Federation of Electric Power Companies publishes "Pluthermal Plan" of each electricity
February 4, 1997 Country is cabinet agreement by "about promotion of the present fuel cycle"
We relate to this page
Inquiry
(ID: 10570)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.