Flat Koba dam (the March, 1984 completion) Hirakoba Dam

The last update date:

Flat Koba dam

 

Plan explanation

 

 In 1959, river often overflowed including 1967, and, in Machida lower part of a river basin of the Matsuura River water system, great flood damage including the inundation of house occurred in 1953.
 Therefore, radical river improvement countermeasures was necessary, but houses crowded in enkawa of Machida River, and large river repair was the difficult situation.
 Furthermore, new water source was necessary on enlarging water-supply district of waterworks in Karatsu-shi.
 Thus, we built flat Kiba dam as multipurpose dam in Kawakami, Machida style region to plan flood control, stabilization of existing profit water intake, maintenance of river environment and securing of tap water source of Karatsu-shi in the prefecture.

 

 

Business summary

 

  1. The business main constituent: Saga Figure of flat Koba dam river
  2. Water system name: The first class water system Matsuura River
  3. River name: Machida River
  4. Position: Kamikamida, Karatsu-shi, Saga
  5. Model:
    • (master) gravity-type concrete dam
    • (the side) earth-fill dam
  6. Dam summary:
    •  Bank high (master) 29.5m (the side) 28.2m
    •  Bank top long (master) 117.0m (the side) 390.0m
    •  Bank volume (master) 27,500m3 (the side) 268,000m3  
  7. Catchment area: 2.24km2
  8. Total storing water capacity: 1,080,000m3
  9. Valid storing water capacity: 1,020,000m3
  10. Term of works: From 1972 to 1983
  11. Total operating cost: 5,450,000,000 yen

 

 

 

We relate to this page
Inquiry
(ID: 12472)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.