To the Saga synthesis top

We carry out maintenance of bridge based on Saga bridge extension of life repair plan

The last update date:

 

Summary

 About bridge more than 3,100 which the prefecture manages, we perform periodical check, and Saga bridge extension of life repair plan grasps healthy degree of bridge at any time and reflects the check result and is plan that gathered up process of a series of approaches to repair diligently from stage when the damage is small.

 It becomes possible to plan extension of life of bridge and reduction, equalization of maintenance administrative expense by repairing with check of bridge based on this plan appropriately and it is effective and can perform maintenance of reliable bridge.

 In Saga, we work on repair of bridge based on "Saga bridge extension of life repair plan" from 2009. 

 

Attached file

PDF Saga bridge extension of life repair plan We open with the other window(PDF: 1.65 megabytes)

PDF Yearly plan We open with the other window(PDF: 512.6 kilobytes)

PDF Saga bridge check manual We open with the other window(PDF: 23.96 megabytes)
 

Related link

We relate to this page
Inquiry
(ID: 12475)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.