To the Saga synthesis top

We carry out supporting business using waste-end tax

The last update date:
 

Announcement of supporting business using waste-end tax

 We started offer of supporting business application using waste-end tax of 2019.

 We perform business as follows in the prefecture to promote recycling.

 

  1. Industrial waste recycling facilities maintenance promotion business (product for → discharge proprietor) [was finished offer period]
  2. Recycling industrial upbringing support project (product for → processing suppliers) [was finished offer period]
  3. Industrial waste processing appropriate management promotion business (truck scale introduction assistance) [offer period: until October 31, 2019]
  4. Business [offer period: until October 31, 2019] such as around industrial waste disposal ground management

 (it is necessary for these business to have you complete by March 31, 2020.)

 

 

 In addition, please consult about that application is examined early as we finish assistance business when total of application reaches the amount of budget even if there is during offer period.

 In addition, as will not be admitted as object business of subsidy when "prior start" before delivery of subsidies decision (conclusion of contract or the start of construction) is accomplished, so
 Please note. 

 

 

1. Industrial waste recycling facilities maintenance promotion business (product for → discharge proprietor)

 We assist a part of expense to need for reduction of industrial waste which industrial waste discharge proprietor in the prefecture performs and facility maintenance for recycling.

 

 1. Supporting target expense

  Construction cost (building (construction) costs), cost of equipment (machine equipment cost), others (design costs)

 

 2. Supporting rates

  Less than a half of supporting target expense

  (about facilities maintenance to promote facility maintenance to propel small piece of wood, abolished plastic, recycling of sludge, animals and plants-related residual substance, thermal recycling less than two-thirds),

  Limit 10 million yen


 3. Adoption requirements

  We give priority to person who does not receive delivery of subsidies by this assistance business in the past.
 

 ※Please consult about examined person until 3R promotion charge.


Attached file

 

Offer period

  Offer period: It was finished.

  ※But we finish reception desk when total of application reaches the amount of budget even if there is during offer period.

 

 

2. Recycling industrial upbringing support project (product for → processing suppliers)

 We assist a part of expense to need industrial waste which people of waste industry in the prefecture perform for maintenance of processing, facility to process, and to recycle.

 

 1. Supporting target expense

  Building (construction) costs, cost of equipment attached to building, machine equipment cost

 

 2. Supporting rates

  Less than a half of supporting target expense

 (about facilities maintenance to promote facility maintenance to propel small piece of wood, abolished plastic, recycling of sludge, animals and plants-related residual substance, thermal recycling less than two-thirds),

  Limit 10 million yen


 3. Adoption requirements

  We give priority to person who does not receive delivery of subsidies by this assistance business in the past.

 ※Please consult about examined person until 3R promotion charge. 

 

Attached file

Offer period

  Offer period: It was finished.

  ※But we finish reception desk when total of application reaches the amount of budget even if there is during offer period.

 

3. Industrial waste processing appropriate management promotion business (truck scale introduction assistance)

 We assist a part of expense to need for introduction, transference, update of waste deployment vehicle measurement facilities (truck scale) to use in final disposal site in the prefecture or middle disposal facility.

 

 1. Supporting target expense 

  Cost of equipment, construction cost pertaining to truck scale and computation processing system

 

 2. Supporting rates

  Less than a half, limit 3 million yen of supporting target expense 

 ※Please consult about examined person until industrial waste charge.

 

Attached file

Offer period

  Offer period: Until October 31, 2019

  ※But we finish reception desk when total of application reaches the amount of budget even if there is during offer period

 

4. Business such as around industrial waste disposal ground management 

 Final action supplier in the prefecture, middle processing supplier holding incineration facilities assist a part of expense to need in maintenance of surrounding environment and business improving based on request of local resident.

 

 1. Supporting target expense

  Expense required for road maintenance repair, maintenance, expense to need to various inspection expenses of safe facility  

 

 2. Supporting rates

  Less than two-thirds, limit 2 million yen of supporting target expense

 ※Please consult about examined person until industrial waste charge.

 

Attached file

 

Offer period

  Offer period: Until October 31, 2019

  ※But we finish reception desk when total of application reaches the amount of budget even if there is during offer period.

 
 

Contact information

 We are in charge of 3R promotion (about 1, 2 mentioned above) and call: 0952-25-7078

 Industrial waste person in charge calls (about 3, 4 mentioned above): 0952-25-7108

 

We relate to this page
Inquiry
(ID: 13905)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.