To the Saga synthesis top

Industrial waste processing plan and state of implementation report (construction industry)

The last update date:

Construction industry (the order of the kana syllabary)

You can see with the following PDF files.

  

No.

Company name

Processing plan

State of implementation report

(2019 plan)

(the 2018 results)

1

Asanuma Gumi Kyushu Branch

PDF Processing plan We open with the other window(PDF: 309.6 kilobytes)

-

2

Ajinomoto engineering Kyushu office

-

PDF Conduct report We open with the other window(PDF: 31.9 kilobytes)

3

Ide dismantling business

4

Imaizumi construction

PDF Conduct report We open with the other window(PDF: 1.58 megabytes)

5

Iwanaga Gumi

6

Umemura Gumi

-

PDF Conduct report We open with the other window(PDF: 178.6 kilobytes)

7

Construction in Okawa

PDF Processing plan We open with the other window(PDF: 276.9 kilobytes)

-

8

Oshima Gumi

PDF Processing plan We open with the other window(PDF: 262 kilobytes)

PDF Conduct report We open with the other window(PDF: 322.3 kilobytes)

9

Ohbayashi Corporation Kyushu Branch

PDF Processing plan We open with the other window(PDF: 281.6 kilobytes)

PDF Conduct report We open with the other window(PDF: 358.7 kilobytes)

10

Okamura construction

PDF Processing plan We open with the other window(PDF: 171.8 kilobytes)

PDF Conduct report We open with the other window(PDF: 141.5 kilobytes)

11

Okamoto construction

PDF Processing plan We open with the other window(PDF: 158.1 kilobytes)

PDF Conduct report We open with the other window(PDF: 150 kilobytes)

12

Okumura Corporation Kyushu Branch

-

13

Kasahara construction

14

Kajima Corporation Kyushu Branch

PDF Processing plan We open with the other window(PDF: 286.9 kilobytes)

-

15

Kaneko construction

-

PDF Conduct report We open with the other window(PDF: 983.3 kilobytes)

16

Kamichika construction

PDF Conduct report We open with the other window(PDF: 144.9 kilobytes)

17

Karatsu construction of public works industry

PDF Processing plan We open with the other window(PDF: 280.3 kilobytes)

PDF Conduct report We open with the other window(PDF: 91 kilobytes)

18

Environment STR

PDF Conduct report We open with the other window(PDF: 128.1 kilobytes)

19

Class Kishimoto

PDF Conduct report We open with the other window(PDF: 116.9 kilobytes)

20

Kyuken

-

PDF Conduct plan We open with the other window(PDF: 238.2 kilobytes)

21

Kyutetsu Kogyo Fukuoka Branch

22

Nail book construction

PDF Conduct report We open with the other window(PDF: 371.2 kilobytes)

23

Kubo construction

PDF Processing plan We open with the other window(PDF: 1.67 megabytes)

PDF Conduct report We open with the other window(PDF: 233.5 kilobytes)

24

Kurihara Kogyo

PDF Conduct report We open with the other window(PDF: 356.2 kilobytes)

25

Kuriyama construction

PDF Processing plan We open with the other window(PDF: 1.86 megabytes)

PDF Conduct report We open with the other window(PDF: 1.36 megabytes)

26

Kuroki construction

PDF Processing plan We open with the other window(PDF: 145.2 kilobytes)

PDF Conduct report We open with the other window(PDF: 128.4 kilobytes)

27

Penta-Ocean Construction Co.,Ltd. Kyushu Branch

PDF Processing plan We open with the other window(PDF: 477.8 kilobytes)

PDF Conduct report We open with the other window(PDF: 441.4 kilobytes)

28

 

Class Sakaguchi

PDF Conduct report We open with the other window(PDF: 237.3 kilobytes)

29

*sammokukogyo

PDF Conduct report We open with the other window(PDF: 68.8 kilobytes)

30

Sato Kogyo Co.,Ltd. Kyushu Branch

31

Sanki Kensetsu

-

32

JA construction create saga

33

Shinohara construction

PDF Processing plan We open with the other window(PDF: 43.5 kilobytes)

PDF Conduct report We open with the other window(PDF: 1.22 megabytes)

34

Shimizu Corp. Kyushu Branch Saga Office

-

PDF Conduct report We open with the other window(PDF: 95 kilobytes)

35

Shimomura construction

PDF Processing plan We open with the other window(PDF: 265.7 kilobytes)

PDF Conduct report We open with the other window(PDF: 370.8 kilobytes)

36

Shuutoku construction

PDF Processing plan We open with the other window(PDF: 2.19 megabytes)

PDF Conduct report We open with the other window(PDF: 191 kilobytes)

37

shoeidate* 

-

38

Prize Sakae plan

PDF Processing plan We open with the other window(PDF: 303.6 kilobytes)

-

39

The top waterfall construction

40

Mao industry

PDF Processing plan We open with the other window(PDF: 264.3 kilobytes)

PDF Conduct report We open with the other window(PDF: 333.5 kilobytes)

41

Suzuki construction

PDF Processing plan We open with the other window(PDF: 498 kilobytes)

PDF Conduct report We open with the other window(PDF: 773.1 kilobytes)

42

Sumitomo Forestry Co.,Ltd. West Kyushu Branch

PDF Processing plan We open with the other window(PDF: 1.19 megabytes)

-

43

Western construction

PDF Processing plan We open with the other window(PDF: 334.5 kilobytes)

-

44

Seiwa construction

PDF Conduct report We open with the other window(PDF: 244.4 kilobytes)

45

Sekisui House, Ltd. Saga Branch

46

The cough Sui Haym nine product branch

-

47                                                                                                                                                                  

Product sum construction Kyushu
  • -

PDF Conduct report We open with the other window(PDF: 131.5 kilobytes)

48

The foundation

PDF Conduct report We open with the other window(PDF: 142.1 kilobytes

49

; mutual sawdust clean

PDF Conduct report We open with the other window(PDF: 51.9 kilobytes)

50

Daito Trust Construction Co.,Ltd. Kurume Branch

-  

51

Daito Trust Construction Co.,Ltd. Saga Branch

PDF Processing plan We open with the other window(PDF: 437.4 kilobytes)

PDF Conduct report We open with the other window(PDF: 593.7 kilobytes)

52

Daito Trust Construction Co.,Ltd. Fukuoka Branch

 -

53

The general idea engineering firm

54

Daiwa Kensetsu

PDF Processing plan We open with the other window(PDF: 308.5 kilobytes)

PDF Conduct report We open with the other window(PDF: 439.6 kilobytes)

55

Daiwa Lease Fukuoka Branch

-

 PDF Conduct report We open with the other window(PDF: 301.9 kilobytes)

56

Yamato paved road

PDF Processing plan We open with the other window(PDF: 1.19 megabytes)

PDF Conduct report We open with the other window(PDF: 504.6 kilobytes)

57

Daiwa House Industry Saga Branch

58

Daiwa House Industry Fukuoka Branch

PDF Processing plan We open with the other window(PDF: 1.16 megabytes)

-

59

Takara Co.,Ltd.

PDF Processing plan We open with the other window(PDF: 6.03 megabytes)

PDF Conduct report We open with the other window(PDF: 10.9 megabytes)

60

Takenaka Corporation Kyushu Branch
  • -

61

Tama Home Chikugo

PDF Processing plan We open with the other window(PDF: 1.47 megabytes)

PDF Conduct report We open with the other window(PDF: 389.3 kilobytes)

62

Terasaki material industry

PDF Processing plan We open with the other window(PDF: 438.6 kilobytes)

PDF Conduct report We open with the other window(PDF: 375.6 kilobytes)

63

Toa Corp. Kyushu Branch

 -

64

Tokyu Construction Co.,Ltd. Kyushu Branch

-

65

Toda Corp. Kyushu Branch

PDF Processing plan We open with the other window(PDF: 321.3 kilobytes)

PDF Conduct report We open with the other window(PDF: 316.4 kilobytes)

66

Nakajima Komuten

PDFProcessing plan We open with the other window(PDF: 186.8 kilobytes)

PDF Conduct report We open with the other window(PDF: 2.03 megabytes)

67

Nakajima construction

 -

 PDF Conduct report We open with the other window(PDF: 100.5 kilobytes)

68

Nakayamagumi

PDF Processing plan We open with the other window(PDF: 2.38 megabytes)

PDF Conduct report We open with the other window(PDF: 1.51 megabytes)

69

narata

PDF Processing plan We open with the other window(PDF: 2.4 megabytes)

PDF Conduct report We open with the other window(PDF: 3.55 megabytes)

70

West Kyushu NICHIREKI

71

West Kyushu road

72

Nishimura engineering works construction

73

Nihon Kensetsu technology

PDF Processing plan We open with the other window(PDF: 67.3 kilobytes)

-

74

Nihon Kensetsu

PDF Processing plan We open with the other window(PDF: 2.49 megabytes)

-

75

Noda construction

PDF Conduct report We open with the other window(PDF: 1.37 megabytes)

76

Nonaka construction

-

PDF Conduct report We open with the other window(PDF: 874.8 kilobytes)

77

Harada Kensetsu

-

78

Hizen road

PDF Conduct report We open with the other window(PDF: 79.9 kilobytes)

79

Hirakawa construction

PDF Conduct report We open with the other window(PDF: 209.3 kilobytes)

80

Plains construction industry

PDFConduct report We open with the other window(PDF: 195.4 kilobytes)

81

Fukamachi construction

PDF Processing plan We open with the other window(PDF: 754.2 kilobytes)

PDF Conduct report We open with the other window(PDF: 911.1 kilobytes)

82

Fuji Construction

PDF Processing plan We open with the other window(PDF: 32.6 kilobytes)

83

Fuji Construction

PDF Processing plan We open with the other window(PDF: 56.2 kilobytes)

PDF Conduct report We open with the other window(PDF: 55 kilobytes)

84

Fuji is based

-

 PDF Conduct report We open with the other window(PDF: 354.9 kilobytes)

85

Maeda Road Construction Co.,Ltd. Yame Office

-

86

Maeda Corp. Kyushu Branch

PDF Processing plan We open with the other window(PDF: 380.3 kilobytes)

PDF Conduct report We open with the other window(PDF: 246.4 kilobytes)

87

Maeda transport

PDF Processing plan We open with the other window(PDF: 42.8 kilobytes)

PDF Conduct report We open with the other window(PDF: 632.9 kilobytes)

88

MAYEDA SANGYO

-

89

matsurigotokomuten

PDF Conduct report We open with the other window(PDF: 301.7 kilobytes)

90

Matuo Construction

PDF Processing plan We open with the other window(PDF: 56.8 kilobytes)

PDF Conduct report We open with the other window(PDF: 60.6 kilobytes)

91

Matsuko

PDF Conduct report We open with the other window(PDF: 254 kilobytes)

92

Circle sincerity development industry

PDF Processing plan We open with the other window(PDF: 266.1 kilobytes)

PDF Conduct report We open with the other window(PDF: 305.7 kilobytes)

93

Marufuku construction

PDF Processing plan We open with the other window(PDF: 111.1 kilobytes)

94

MISAWA HOMES Saga

PDF Processing plan We open with the other window(PDF: 338.8 kilobytes)

95

Class peak

PDF Processing plan We open with the other window(PDF: 1.04 megabytes)

  • -

96

Miyaji engineering firm

-

PDF Conduct report We open with the other window(PDF: 59.6 kilobytes)

97

Muta construction

PDF Conduct report We open with the other window(PDF: 69.9 kilobytes)

98

Muta forestry tree planting
  • -

99

Morinaga construction

-

PDF Conduct report We open with the other window(PDF: 138.9 kilobytes)

100

 morodomi construction

-

101

 Mountain matter construction

102

 Yamaguchi constructionPDF Conduct report We open with the other window(PDF: 173.5 kilobytes)

103

 Yamazaki Construction

PDF Processing plan We open with the other window(PDF: 210.1 kilobytes)

PDF Conduct report We open with the other window(PDF: 158.7 kilobytes)

104

*tokudate*, Egashira ordinary construction community

-

105

 Yoshinaga construction

-

106

 Wakachiku Construction Co.,Ltd. Fukuoka Branch

 107

 Fujiki Komuten

-

 

 

We relate to this page
Inquiry
(ID: 14140)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.