To the Saga synthesis top

Authorization of plan such as low-carbon building new construction

The last update date:
 

Contents

Summary of low-carbon building
Procedure for authorization of low-carbon building in Saga
 (1) Documents relations pertaining to certification application
 (2) List of government agencies with jurisdiction of Saga
  (3) Documents relations pertaining to construction completion
  (4) Notifecations when we cancel construction

 

Summary of low-carbon building

 With low-carbon building, low carbon of city says "thing that new construction was performed based on plans such as low carbon building new construction that it is building contributing to restraint of carbon dioxide emission, and received authorization" prescribed in law (2012 law No. 84) about promotion of becoming. Person who is going to build low-carbon building makes plans such as low-carbon building new construction and can apply for authorization of government agency with jurisdiction. In addition, the enforcement day of law is December 4, 2012.

 

 

 By receiving authorization of "plans such as low-carbon building new construction", can receive home loan reduction of taxes (income tax) and kind treatment in the taxation system of registration and license tax (the preservation registration, registration of a transfer) and relaxation of floor area ratio in Building Standard Act.

 

⇒Summary of law, the details of tax benefits, please identify the Ministry of Land, Infrastructure, Transport and Tourism homepage We open with the other window(external link).

 

Procedure for authorization of low-carbon building in Saga

Certification application to 1 government agency with jurisdiction

(1) Documents relations pertaining to certification application 

  We apply to government agency with jurisdiction for standard certification application procedure after low-carbon building new construction received prejudging of plan by registration house performance evaluation engines.

  • It is necessary for certification application of plan to perform low-carbon building new construction before construction start of low-carbon building of the plan concerned.
  • Please submit thing which attached documents to advocate to "certification application required document table" on "authorized application" to government agency with jurisdiction.
  • When change of plan includes low-carbon building new construction after the authorization of plan, plan change certification application is necessary except case of immaterial alteration.

(2) List of government agencies with jurisdiction of Saga

  Government agency with jurisdiction performs authorization of plan such as low-carbon building new construction.

  Territory of government agency with jurisdiction of Saga is as follows.

The location of building doing certification application

Government agency with jurisdiction

Phone number

Target municipalities in the prefecture except Saga-shi

(area of restricted zone designation of Karatsu-shi, Tosu-shi, Taku-shi, Imari-shi, Takeo-shi, Kashima-shi, Ureshino-shi, Kiyama-cho, Miyaki-gun and Arita-cho, Nishimatsuura-gun)                                                         

Saga  

Charge: Department of Land Development Architecture & Housing Division (Saga prefectural government office new administrative agency the seventh floor)

Receptionist of certification application goes only in the Architecture & Housing Division mentioned above.

 

0952-25-7165 (direct)

Saga-shi

Saga-shi          

Charge: The Construction Department Building Guidance Division (the fourth floor of the city hall)

0952-40-7170 (direct)

 

(3) Documents relations pertaining to construction completion

  • When building works of low-carbon building pertaining to plan such as low-carbon building new construction are completed, report of construction completion is necessary.
  • You attach "construction control report" to "report of building works of building based on plan such as low-carbon building new construction having been completed", and please submit to government agency with jurisdiction.

 

(4) Notifecations when we cancel construction

  • When low-carbon building new construction cancels building works of low-carbon building pertaining to plan, please submit construction cancellation offer book to government agency with jurisdiction.

 ※ Each style of authorized application, certification application required document table, report of construction completion, construction cancellation offer book and construction control report, please confirm "attached file".

 

    [standard certification application method] With new window(82KB, PDF file)

 

 

 (5) Tables such as registration house performance evaluation engines

 List of registration house performance evaluation organizations carrying out prejudging in Saga

 [making docket now. Please wait for a while.]

 

 

Summaries of authorized standard

Summaries With new window(923KB, PDF file) such as authorized standards

 

 

Application fee (Saga-shi is excluded.) in Saga government agency with jurisdiction area

The beginning of 1 certification application

※(1) "*goshoyu" caught technical examination such as registration house performance evaluation engines beforehand and received grant of identification of conformity.

(2) "Identification of conformity nothing" is thing except (1). (when certification application is done without receiving technical examination such as registration house performance evaluation engines beforehand, please consult with government agency with jurisdiction.)

※When low-carbon building new construction demands building certification application from government agency with jurisdiction in conjunction with certification application of plan, we add building certification application fee separately.

   Original certification application fee table With new window

 

2 plan change certification application

 Plan change certification application fee table With new window

 ※On application, please confirm in fee check list by all means so that there is not overs and shorts of fee.

 
 

Attached file (styles such as certification applications)

[certification application, change certification application]

 

[report of construction completion]

 

[offer of cancellation of building works]

 

We relate to this page
Inquiry
(ID: 14566)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.