To the Saga synthesis top

Announcement of windows such as building certification application

The last update date:
 

 Windows such as building certification application in the prefecture

 Application window

Address 

 Phone number  Jurisdiction area

 Saga Construction Office Building Control Section

 2-2-67, Yae, Saga-shi  0952-24-4369  Ogi-shi, Taku-shi

 Eastern Construction Office Building Control Section

 1234-1, Motomachi, Tosu-shi   0942-83-4398

 Tosu-shi, Kiyama-cho, Kamimine-cho

 Miyaki-cho, Kanzaki-shi

 Yoshinogari-cho

 Karatsu Construction Office Building Control Section

 3-1-5, Futago, Karatsu-shi  0955-73-2865  Karatsu-shi, Genkai-cho

 Imari Construction Office management section

 122-4, Shintencho, Imari-shi  0955-23-4721  Imari-shi, Arita-cho

 Kitou Construction Office Building Control Section 

 265, Takeochoshowa, Takeo-shi  0954-22-4185

 Takeo-shi, Omachi-cho, Kouhoku-machi

 Shiroishi-cho, Kashima-shi, Ureshino-shi

 Tara-cho

 Saga-shi Construction Department Building Guidance Division

 1-1, Sakaemachi, Saga-shi  0952-40-7171  Saga-shi

※Memorial presented to the Throne is window of specific administrative agency. 

※Application to private appointment confirmation inspection engine is possible, too. 

 
 

Fees such as building certification application 

Please confirm the following table.
※There is no change in list of following fees after October 1, 2019.

 

 

 

In the case of building requiring structural calculation compatibility judgment

※ Confirmation application adds structural calculation compatibility judgment fee to fee and asked for judgment to appointment structural calculation compatibility judgment engine (we say "proper seal engine" as follows.) through chief architect and designated confirmation inspection engine, but will apply from the master of building (applicant) to proper seal engine with revision of Building Standard Act directly on after June 1, 2015 until now.

 

※Please refer to proper seal organization for structural calculation compatibility judgment application fee directly.

 

 

In the case of building requiring building energy consumption performance compatibility judgment

When we build constant size or more buildings from April 1, 2017, building energy consumption performance compatibility judgment may be necessary. As for the details, please see page of "procedure pertaining to the building energy saving method".

Procedure pertaining to the building energy saving method

 
 
 

Check list (April 1, 2020 ...) to attach to building certification application 

At the time of building certification application after April 1, 2017, please attach check list of following (1) - (3).
At the time of building certification application after April 1, 2020, please attach questionnaire of following (4) in addition to the check list mentioned above.
(※(5) Please attach check list of this as needed.)
In addition, please refer to each application ahead for Saga-shi and private designated confirmation inspection organization. 
 

Related link

 

We relate to this page
Inquiry
(ID: 14621)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.