To the Saga synthesis top

About bulletin systems such as building, building facilities

The last update date:

With bulletin system

It is necessary to usually make maintenance in legitimate state to keep safety such as buildings.

 Particularly, it is necessary to ensure the further security because it might develop for casualty about buildings which the unspecified number of people use when accidents such as fires occur once.

 Therefore, we let qualified person having expertise for those owners, managers regularly inspect Surveys for building, building facilities, fire prevention equipment and elevator in Building Standard Act and oblige to reporting the result to identification administrative agency.

 

※"Specific administrative agency" is administrative agency having authority to perform permission or the authorization based on Building Standard Act and is in Saga the Governer in the mayors concerned about other municipalities when there is in Saga-shi in Saga.

 

Review (the June 1, 2016 enforcement) of bulletin system

About buildings obliged to carry out bulletin, identification administrative agency appointed from constant buildings set forth in laws and ordinances, but, by the enforcement such as laws (2014 law No. 54) to revise a part of Building Standard Act, country appoints by laws and ordinances about particularly important buildings in in fire prevention or hygiene in security uniformly, and identification administrative agency will appoint depending on the local fact about other buildings until now.

 For more details, please refer to this.

 ⇒ The Japan Building Disaster Prevention Association <bulletin system portal site> We open with the other window(external link)

 

Buildings and report time when are targeted for bulletin

 

 Buildings targeted for bulletin merged buildings of the country appointment mentioned above and prefectural designation. (buildings which the prefecture appointed are targeted sequentially until now)

 By use, scale of building which country appointed, there are buildings targeted for bulletin newly.

  

Building

Object (we offer floor except evacuation floor in use listed below (1-b, 6-b) except 7)

Report

Use

Scales (thing corresponding to either)

Time of commencement

Time

1

a

Theater, movie theater, variety theater, viewing ground (except outdoor viewing ground) public hall or assembly room

  • The use (part more than 100 square meters) concerned is on basement or floor on the third floor or above
  • Thing with floor space (seat part) of the use concerned 200 square meters or more
  • In theater, movie theater, variety theater, the first floor does not have piano nobile

H28

(※ 1)

As for every three years

September 1

...

November 30

made

b

Theater, movie theater, variety theater, viewing ground (except outdoor viewing ground) public hall or assembly room

  • Thing with floor space of the use concerned 300 square meters or more

H28

2

Department store, market, exhibit space, cabaret, cafe, nightclub, bar, dance hall, game center, public bath, waiting for, restaurant, restaurant or store which runs article dealership

  • The use (part more than 100 square meters) concerned is on basement or floor on the third floor or above
  • Thing with floor space of the use in the second floor concerned 500 square meters or more
  • Thing with floor space of the use concerned 3,000 square meters or more

H29

3

Inn or hotel

  • The use (part more than 100 square meters) concerned is on basement or floor on the third floor or above
  • Thing with floor space of the use in the second floor concerned 300 square meters or more

H29

4

Hospital, medical office (thing with accommodating facilities of patient is best), child welfare institution of going to bed use

  • The use (part more than 100 square meters) concerned is on basement or floor on the third floor or above
  • Thing (about hospital, existence floor medical office, we are only on the condition that the second-floor part has accommodating facilities of patient) with floor space of the use in the second floor concerned 300 square meters or more

H30

5

Gymnasium, museum, art museum, library, bowling alley, skiing area, skating rink, swimming ground, sports practice field (except thing which is attached all to school)

  • The use (part more than 100 square meters) concerned is on floor on the third floor or above
  • Thing with floor space of the use concerned 2,000 square meters or more

H28

(※ 1)

6

a

Apartment house (limited to house for elderly people with service) or dormitory (limited to house for elderly people with service, dementia elderly person group home, person with a disability group home)

  • The use (part more than 100 square meters) concerned is on basement or floor on the third floor or above
  • Thing with floor space of the use in the second floor concerned 300 square meters or more

H28

(※ 1)

b

  • Rooming house, apartment house except a mentioned above or dormitory

  • Thing that number of floors has 1,500 square meters or more floor space of 5 or more and the use concerned

H28

7

  • Building which is similar to these office or other

  • Thing that number of floors has 1,000 square meters or more floor space of 5 or more and the use concerned

H28

<provisional measure>

※Among buildings targeted for report of 1 2016, we say about the first report of building (in fact, we exist as of June 1, 2016, and limit to thing which does not correspond to building targeted for report of the old prefecture designation.) targeted for report newly from September 1, 2016 to November 30, 2017. 


Building facilities

Classification

Object

Report time

Elevator

  •  Elevator
  •  Escalator
  •  Elevator (thing of floor type is best) for exclusive use of parcel

(among elevators prescribed in thing which goes all up and down with chisel in dwelling unit, Industrial Safety and Health Law enforcement order Article 1 No. 9 except thing corresponding to Article 12 Paragraph 1 No. 6 to give an order to start)

Every year April 1

...

Next year March 31

(when there is day that reckons, and passes in one year from on day when law Article 7 Paragraph 5 or 2 Paragraph 5 (all of Article 7 include case to apply mutatis mutandis in 2 of law Article 87 before the same day and received grant of certificate of inspection by regulations of) or day of the last report on the last day in month to belong on the passing day concerned)

made (※ 2)

Application with necessary changes workpiece

  •  Elevator for sightseeing, escalator for sightseeing
  •  Elevated game facilities such as coasters
  •  Game facility which does rotary motion with motors such as merry-go-round, Ferris wheel

Fire prevention equipment

  • Fire prevention equipment which is established to country-designated building
  • Fire prevention equipment which is established to building with floor space 200 square meters or more in uses to advocate below
  1. Hospital, existence floor medical office
  2. Apartment house (limited to house for elderly people with service)
  3. Dormitory (limited to house for elderly people with service, dementia elderly person group home, person with a disability group home)
  4. Child welfare institutions of going to bed use

(except fire prevention equipment of outer wall opening, regular closure-type fire prevention equipment, fire prevention damper)

Every year April 1

...

Next year March 31

made (※ 2)

Building facilities

Ventilation equipment of building (2,000 square meters or more things are best as for floor space) to fry in memorial presented to the Throne <building> 1-4, flue gas facilities, emergency lighting equipment

Every year September 1

...

November 30

made (※ 3)

<provisional measure>

※About the first report of elevator for exclusive use of 2 parcels and fire prevention equipment (thing which, in fact, exists as of June 1, 2016 or thing which received grant of certificate of inspection to May 31, 2017), we are doing from June 1, 2016 to March 31, 2019.

※Among building facilities targeted for 3 reports, we say about the first report of building facilities (in fact, we exist as of June 1, 2016, and limit to thing which does not correspond to building facilities targeted for report of the old prefecture designation.) targeted for report newly from September 1, 2016 to November 30, 2017. 

Periodical Surveys, qualified person (June 1, 2016 ...) which we can inspect 

 By the enforcement such as laws (2014 law No. 54) to revise a part of the Building Standard Act, qualified person system of bulletin Surveys, statement of audit changed, too. When it follows in which was special building Surveys qualified person, examination with elevator qualified person, building facilities inspection qualified person, and Surveys, inspection is going to work for fixed period, we file for shift to special-use building investigators, and it is necessary to receive grant of identification of new qualified person until now. (the first class authorized architect or second class authorized architect having license can work without receiving grant of identification of qualified person) 

 In addition, periodical inspection report about fire prevention equipment was founded, and structure which person (fire prevention equipment examiner) having exclusive knowledge inspected was introduced.

 

 Please refer to this for procedure for application of identification of qualified person.

 ⇒ The Ministry of Land, Infrastructure, Transport and Tourism <about procedure for application of identification of qualified person> We open with the other window(external link)

 

<range where each qualified person can perform Surveys, inspection>

Qualified person division

Surveys of building

Inspection of building facilities

Inspection of fire prevention equipment

Inspection of elevator, game facility

 The first grade authorized architect

 The second grade authorized architect

 Special-use building investigator

X

X

X

 Building facilities examiner

X

X

X

 Fire prevention equipment examiner

X

X

X

 Examiners such as elevators

X

X

X

 ※When authorized architect gets reward and carries out periodical Surveys, it is necessary to receive registration of authorized architect office by authorized architect method Article 23.

 

About submission of periodical report and bulletin summary book (including various Notifecations such as changes) 

Submission window and reception hours

 <submission window>

Saga construction technological assistance mechanism Building Control Section 

(address: in Hachinohe, Nabeshimacho, Saga-shi character Fukamachi 3182 Phone: 0952-26-1697)

 

 <reception hours, lounge day>

   Reception hours: From 9:00 a.m. to 11:00 a.m., from 1:00 p.m. to 4:00 p.m.

   Lounge day: Saturdays, Sundays, and holidays festival day and from 13 to 15 on August and from December 29 to January 3 

  

The submission number of copies

  • Periodical statement, please submit copy to plus, vice-two copies, bulletin summary book. 
  • Various Notifecations such as changes, please submit copy.

 

※Submission is possible in owner or manager, Surveys, person who inspected or agent.

※Please download styles such as reports than related link.

※We put together about concrete building questionnaire, concrete building questionnaire attachment, answer to earthquake-resistant diagnosis, repair state of implementation special examination of existing building (attached sheet style), and submission, please.


Related link


 

We relate to this page
Inquiry
(ID: 14750)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.