To the Saga synthesis top

We issue "Construction Recycling Law Notifecations finished seal"

The last update date:

 After having accepted construction notification form targeted for Construction Recycling Law in the window of the prefecture engineering works office in Saga from April 1, 2010, we issue "Construction Recycling Law Notifecations finished seal" for person of Notifecations.

 

  This seal facilitates confirmation of reported thing by attaching on mark to post on the construction spot after the construction start of construction and plans early detection and prevention of without notice construction and aims at exclusion of violation supplier.

 

 For details, please see the following attached file.

 

  About production of documents pertaining to construction recycling, please see this.

 https://www.pref.saga.lg.jp/dynamic/page24518.html

 

 

 

 Attached file

PDF Construction Recycling Law Notifecations finished seal distribution flyer We open with the other window(PDF: 46.5 kilobytes)


 

 

 

 

We relate to this page
Inquiry
(ID: 24546)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.