We would like Notifecations in basic date (March 31, 2020) based on the house warranty against vices observance of a contract method (to constructors of Saga the Governer permission) by April 21

The last update date:

 

 

About house defect (lend) security observance of a contract law

 As for the contractor of new house, it was decided to suffer warranty liability for 10 years about part which prevented main part and invasion of rainwater in structure proof stress of house by "securing of house quality law" enforced in 2000. 

 

 And, about new construction house delivered after October 1, 2009 by "house warranty against vices observance of a contract law" enforced in 2009, contractor took securing of means measures (participation to insurance or deposit of deposit) and was required to report to permission administrative agency (in the case of Saga the Governer permission supplier Saga) every (March 31, September 30) in two times a year of basic dates.

 

In addition, it is necessary it continues even if the number of houses of new construction house which we delivered is 0 cases afterwards, and to report. 

 

  When we cannot conclude contract newly from day 50 days after the next day in basic date when we are not doing case and Notifecations which constructor who delivered new house does not take securing of means measure for and conclude contract in violation of this, it is imprisonment or less or is sentenced to fines 1 million yen or less or both for one year, and supervision disposal based on Construction Industry Act may be imposed, too.

 

 

Target company

 Constructor who received permission of Construction Industry Act that delivered new house to owner on after October 1, 2009

 

 Case that constructor who received permission of building works business, carpenter construction business undertakes construction of new house as original contractor becomes a target main, but is when constructor who received permission of other type of industry constructs main part or part preventing invasion of rainwater in structure proof stress of new construction house. 

 

 

Notifecations methods

  Item

  Contents

 Notifecations time

 

It is less than three weeks from basic date (March 31, September 30)

Therefore, it is April 21 each until October 21.

But the next day becomes time limit if we are holiday of administration.

 

 Notifecations point

 

〒840-8570 1-1-59, Jonai, Saga-shi 

Saga Department of Land Development Construction & Technology Division construction industry charge (new administration the eighth floor of the ridge)

 

(note 1) Minister permission supplier, please tell the Ministry of Land, Infrastructure, Transport and Tourism Kyushu district maintenance station directly.

(mail destination of minister permission supplier)

〒812-0013 2-10-7, Hakataekihigashi, Hakata-ku, Fukuoka-shi, Fukuoka Fukuoka second joint government building annex 

kokudokotsushokyushujiho*bikyokudatematsurigotobukeikaku, construction industrial section

 

(note 2) To charge (new administration the seventh floor of the ridge) (telephone 0952-25-7164) Department of Land Development Architecture & Housing Division general affairs's house-based as for the residential land building transactions business registration supplier

Please report.

For more details, please see page of "we will tell about Notifecations procedure for house warranty against vices observance of a contract method" (product for house-built suppliers). 

 

 The Notifecations number of copies and method

 

(the Notifecations number of copies)

One copy of original

 

(Notifecations method) 

Mail or bringing (window submission)

 

In either case, it is unnecessary via engineering works office, but mail, please as much as possible as it is expected that window is crowded.

In addition, on mail, please write in red with "the house warranty against vices observance of a contract method notification form living-in-inside" on the front of envelope.

 

 

Notifecations documents

 

1 notification form (the first style to set of the house warranty against vices observance of a contract method enforcement regulations)

 

Case only for insurance

 

  • ※When there is not new house which we delivered this time, only this notification form is enough if they submit, and attached documents 2 or less are unnecessary.

 

Table (2 styles of the first to establish in the enforcement regulations) of 2 delivery articles

  • PDF Portable Document Format (16KB) We open with the other window(PDF: 15.7 kilobytes)
  • ※In the case of insurance, you list permission number, representative name in predetermined column of table sent by insurance company, and please submit representative seal after sealing. 

     

3 insurance contract conclusion certificates (when we do insurance contract newly)

    

Copy of 4 deposits book (when we deposit deposit newly)

    

(reference)

 

 

 

Procedure to be necessary after the Notifecations

 When lack or case and deposit office which we exceeded are changed, in the constructor whom we deposited, money on deposit comes to need the following procedures between permission administrative agency.

 

Matter which needs procedure

The application title of a book

Style downloading

When insurance participation or deposit of deposit was not carried out enough in the basic date

Confirmation application (No. 2 style) about deposit of sum of housing construction warranty against vices deposit

Word WORD format (114KB) We open with the other window(word: 114 kilobytes)

When, due to return and others, money on deposit would be short to the amount of standard

Notification form (No. 4 style) about deposit of deficiency of housing construction warranty against vices deposit

Word WORD format (67KB) We open with the other window(word: 67 kilobytes)

When the nearest deposit office was changed by move of principal office

Notification form (No. 5 style) about transfer of deposit of housing construction warranty against vices deposit

Word WORD format (25KB) We open with the other window(word: 24.5 kilobytes)

When as deposits in basic date exceeded the amount of standard of the basic date concerned, we want to perform recovering

Written application for approval (No. 6 style) about recovering of housing construction warranty against vices deposit

Word WORD format (44KB) We open with the other window(word: 43.5 kilobytes)

 (reference)PDF Mention example We open with the other window(PDF: 235.7 kilobytes) 

 
 

Attached file 

PDF As for every flyer, do not forget two times a year of Notifecations procedures! (point of flow of Notifecations procedure) We open with the other window(PDF: 1.37 megabytes) 

PDF The house warranty against vices observance of a contract method (procedures for constructor) We open with the other window(PDF: 101.9 kilobytes)


 

We relate to this page
Inquiry
(ID: 24609)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.