To the Saga synthesis top

About application procedure for management matter examination (management matter examination relations)

The last update date:

         

          In Saga, we consign examination duties pertaining to management matter examination to Saga administrative scrivener society from June, 2019.

           

           

      We explain application procedure for management matter examination
    Application style of management matter examination changes from November 1, 2016.

            In addition, please confirm again as you make change about "guide of management matter examination" and publish as edition on November 1, 2016.

            New style publication place is this place

             

            (1)Corporation number mention column is added to management matter examination application (11 of style No. 25). In addition, there is change of entry position of clause turn 07 (corporation or personal, amount of capital or the investment total sum) of the application.

             

             ※When prejudging documents of management matter examination are submitted to Construction & Technology Division after October 1, 2016, I would like submission with new style (already with old style jizenshin

              ) that we will cooperate as we may ask for replacement to new style if sashorui is submitted.

              In addition, please confirm 8 pages of "guides (list of application documents) of management matter examination" and 9 pages (note 1) as corporation number confirmation filing of paper is necessary.

             

             (reference) Example of corporation number confirmation documents: We printed copying of corporation number-designated office action, applicable screen of "National Tax Agency corporation number public announcement site"

             

             About National Tax Agency corporation number public announcement site (National Tax Agency homepage) We open with the other window(external link)            

             

            (2)We published guide (November 1, 2016 version) of management matter examination. 

              Guide (November 1, 2016 version) of management matter examination is this

             

             

             

            System revision of management matter examination is made from June 1, 2016.

 (1)Management matter examination of the dismantling construction work is founded.

  • ※When we apply for management matter examination of "the dismantling construction work", it is necessary to receive permission of construction industry of "the dismantling construction work" beforehand.

 (2)Provisional measure is established as measures to relax influence on general rating scale value (P) by separation of "black kite, earthwork construction business" and "the dismantling construction work".

(provisional measure period: from June 1, 2016 to May 31, 2019).

・When "black kite, earthwork construction business" or "the dismantling construction work" is applied for, we perform general rating scale value (P) evaluation by "black kite, earthwork, concrete, the dismantling" (provisional measure).

・One technical personnel can apply as engineer to 3 types of industry in total only when we apply for "black kite, earthwork construction business" and "the dismantling construction work" about technical personnel at the same time.

 (3)Provisional measure is established about requirements of technical personnel of "the dismantling construction work".

・Engineer (limited to existing person meeting engineer requirements of "black kite, earthwork construction business" before the law enforcement.) of "black kite, earthwork construction business" can consider to be engineer of "the dismantling construction work" during until March 31, 2021.

 (4) We do not perform the handling of reexamination accompanied with this revision. 

 

 ※About the handling of Saga management matter examination by this revision

 PDF System revision summary We open with the other window(PDF: 113.1 kilobytes) of management matter examination 

 ※About the Ministry of Land, Infrastructure, Transport and Tourism public announcement material (the Ministry of Land, Infrastructure, Transport and Tourism homepage)

   About the promulgation of "departmental order to revise a part of the Construction Industry Act enforcement regulations" We open with the other window(external link)

   PDFAbout Construction Industry Act revision We open with the other window(PDF: 1.23 megabytes) 

 
Application procedure  

 Attached file refers to "guide 1-4 of management matter examination", and, about management matter examination application procedure in Saga, please prepare for application documents.

<notice matter>

1 attached documents

 As attached documents of "construction of completion (application attached sheet one) according to construction type", the Governer permission supplier, please submit "construction record of qualifications and experience" to of minister permission supplier with "construction of completion itemized statement".

 

2 examination fees

 Please refer to attached file "guide -1" for examination fee. 

 (reference) list of Saga certificate stamp selling judgment places  

 

Processing period required for 3 general rating scale value result office action (P point) issuance

 (1)It is ... about 1-1.5 or month from prejudging production of documents to prejudging (documents examination)  

・When we submit documents for prejudging by mail, I would like "the management matter examination prejudging documents living-in-inside" and mention on the envelope surface.

・The submission number of copies is one copy of original. Please bring copy (for applicant reserve) on the day of this examination.

    (mailing address) 〒 840-8570 1-1-59, Jonai, Saga-shi Saga Department of Land Development Construction & Technology Division construction industry charge

   

・By prejudging, I will inform discrepancy. Please fill in contact information of person whom you can answer about contents. 

・On the date and time of this examination, I will inform by postcard within about one month from day when prejudging documents arrived. In the case of prejudging production of documents, please enclose postcard which listed predetermined matter.

 

(2)It is ... about one month from this examination (meeting examination) to result office action issuance 

・We examine this examination while hearing contents. You can answer about contents of documents, and please attend. 

・Submission documents are short on examining, and it is necessary that examination is suspended and comes over to cases that cannot reply question for indistinct point from person of examination again, and please note enough as you become cause that issuance of result notification is late.

 We need processing period of about 2-2.5 months before general rating scale value result office action (P point) is issued by prejudging filing of paper. As we perform examination intensively under the schedule planned to be constant, we have you perform by self-responsibility of applicant about application and would appreciate your taking room by all means. In addition, it is not possible to hasten issuance of result office action even if there is any reason.

 
 

Date of 4 application

 Examination specified date is the settling day just before application day. Case one year after the settling day cannot receive examination to assume the day basic date. (what can receive examination just reaches the next settling day.) For example, in the case of financial statements, it is necessary on August 31, 2018 that examination to assume the day basic date receives examination by August 31, 2019, and it is not possible on after September 1, 2019.

 

 In addition, validity of management matter examination is one year seven months from examination basic date (the settling day just before application day) of the management matter examination after result office action was issued. It is necessary to receive management matter examination after the financial statements immediately every year every year so that validity continues without break when we are going to undertake public construction directly.

 
 

 5 and others

 After the result office action issuance, correction that assumed item coming to responsibility on the applicant side such as omission of entry or entry error reason does not admit. Please apply after person in charge was confirmed in about contents enough.

 

 When we apply for go*jikeishinto*shukeishin, please consult beforehand.

 Minister permission supplier look at this Ministry of Land, Infrastructure, Transport and Tourism Kyushu district maintenance station homepage. We open with the other window(external link)

 

 Attached file (guide, application style) 

[guide] 


[application style] 

[style] Construction of completion itemized statement (Excel file 37 kbytes) With new window 

 

[other styles] 

 

Social insurance non-participation countermeasures of construction industry

 Tightening of demerit mark measures to insurance non-participation company in management matter examination (the July 1, 2012 enforcement)

As countermeasures to the issue of social insurance non-participation in construction industry, the following review is performed about items of evaluation pertaining to (the situation of labor welfare) such as social nature and standard.

 (main contents) 
We divide "health insurance and welfare annuity insurance" into "health insurance" and "welfare annuity insurance" and examine 1 end-point for each item.
2 "unemployment insurance", in the case of non-participation, we have with 40 points of deduction (in 3 insurance in the case of non-participation 120 points of demerit marks) each about each item of "health insurance" and "welfare annuity insurance".

 

For more details, please see the Ministry of Land, Infrastructure, Transport and Tourism homepage (press release). We open with the other window(external link)

 

In addition, we file for insurance participation, and, as countermeasures to the issue of social insurance non-participation in construction industry, "health insurance" sends "teachers' textbook" requesting the report to constructor (※) admitted that, however, it is non-participation who should take out "welfare annuity insurance" and "unemployment insurance" based on Construction Industry Act Article 41 within a fixed period of time from November 1, 2012.

 

For more details, please see the Ministry of Land, Infrastructure, Transport and Tourism homepage (social insurance non-participation countermeasures of construction industry). We open with the other window(external link)

 

(reference) with application office with insurance participation duty

Health insurance, welfare annuity insurance……Office of corporation or personal office using always more than five workers (we do not include family worker)
Unemployment insurance……Office (it does not matter to individual, corporation) which employs worker alone 

 

(※) When person insured of health insurance and employee that it should be receive approval of Director pension desk work even if it is office of corporation or personal office using always more than five workers (we do not include family worker) and join National Health Insurance Association (national engineering works architecture National Health Insurance Association) pertaining to construction industry, it becomes excluded. (we list in column of "having health insurance participation or not" with "3")

 

 

Related link (social insurance participation relations)

When office is going to catch application of health insurance (association kempo), welfare annuity insurance (Japanese pension mechanism homepage); We open with the other window(external link) 

The pension office location (Saga) We open with the other window(external link) 

Procedure for unemployment insurance that business owner holds (Ministry of Health, Labour and Welfare Employment Security Bureau homepage) We open with the other window(external link)  

HelloWork (public employment security office) (Ministry of Health, Labour and Welfare homepage) We open with the other window(external link) 

(reference) registration business condition analysis engine

Registration business condition analysis organizations which received registration of the Minister of Land, Infrastructure and Transport are as follows.

(registration number)        (name of engine)                                  (the location of office) (phone number)

1

Construction industry information management center We open with the other window(external link)

2-11-24, Tsukiji, Chuo-ku, Tokyo 03-5565-6131
2

The management data research We open with the other window(external link)

2-2-37, Kyomachi, Chuo-ku, Kumamoto-shi, Kumamoto

096-278-8330

 4

Wise community data system We open with the other window(external link)

2120-1, Tamachi, Nagano-shi, Nagano 026-232-1145
5

Kyushu management information analysis center We open with the other window(external link)

22, Imahakatamachi, Nagasaki-shi, Nagasaki 095-811-1477
7 Hokkaido management information center We open with the other window(external link) 4-8-1, Higashisapporo-1-jo, Shiroishi-ku, Sapporo-shi, Hokkaido 011-820-6111
8

Net core We open with the other window(external link)

2-5-24, Tsurutamachi, Utsunomiya-shi, Tochigi 028-649-0111
9

Business condition analysis center We open with the other window(external link)

3-31-8, Omorinishi, Ota-ku, Tokyo 03-5753-1588
10

Business condition analysis center West Japan company We open with the other window(external link)

1-6-10, Kitakotoshiba, Ube-shi, Yamaguchi 0836-38-3781
11
Japan construction industry business analysis center We open with the other window(external link) 6-8-27, Kuzuharahonmachi, Kokuraminami-ku, Kitakyushu-shi, Fukuoka 093-474-1561

 July 2, 2012 ...

21

 Construction system We open with the other window(external link)               

312-1, Ishizaka, Fuji-shi, Shizuoka

0545-23-2607

December 1, 2014 ... 

22

 Construction industry management information analysis center We open with the other window(external link)                        

2-17-6, Shibasakicho, Tachikawa-shi, Tokyo 042-505-7533

 

(note) missing number is to registration number. 

(reference) privacy policy about management matter examination application 

■About personal information pertaining to management matter examination (evaluations such as management scales and general rating scale value) application
We use personal information to acquire by request for general rating scale value which management scales that Saga the Governer is submitted to based on 26 regulations of Construction Industry Act Article 27 are submitted to based on 29 regulations of application of evaluation and Article 27 (we say "management matter examination application" as follows.) as follows or provide to third party.
Examination desk work such as 1 management matter examination application
Desk work such as guidance for person who performed 2 management matter examination application

■About personal information pertaining to examination result of management matter examination (evaluations such as management scales and general rating scale value)
We use personal information to make based on examination results (we say "management matter examination result" as follows.) such as application of evaluation such as management scales that Saga the Governer was submitted to based on 26 regulations of Construction Industry Act Article 27 and application submitted by request for general rating scale value submitted to based on 29 regulations of Article 27 as follows or provide to third party.
Notice (we include thing to provide by public construction ordering support database system.) of management matter examination result for corporation prescribed in 2 of one country, other local public entities and Construction Industry Act enforcement order Article 27
Public announcement of 2 management matter examination results and reading (we entrust construction industry information management center and include thing to offer in public announcement and reading.)
Desk work such as guidance for person who received 3 management matter examination results
It is the next use by regulations or offer in law Article 8 Paragraph 2 about protection of personal information that 4 administrations hold
Oh, when there is agreement of) person or when we contribute to the person
(i) When use at limit necessary for accomplishment of function which Saga the Governer establishes in laws and ordinances
When cormorant) country, other local public entities, incorporated administrative agencies use at limit that is necessary for accomplishment of desk work that laws and ordinances determine or duties
Oh, when we provide for purpose of making of statistics or scientific study) exclusively
When it becomes benefit of person clearly to contribute to person except the o) person
(xiv) When there is special reason about giving others

 

(reference) public announcement of management matter examination result

About result of management matter examination (keishin), we are announced by point of view such as utilization of deterrent of falsehood application by security of equity by more improvement of transparency of public construction bid participation applicant choice procedure, disclosure of company information and mutual monitoring. 

 About result of constructors where jushin did keishin of the whole country, we can read on homepage We open with the other window(external link) of this construction industry information management center (CIIC).


In addition, about result of Saga the Governer permission supplier, we can read in the Saga prefectural government office Department of Land Development Construction & Technology Division (new administration the eighth floor of the ridge).

We relate to this page
Inquiry
(ID: 24625)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.