To the Saga synthesis top

Notifecations (Notifecations of house-built work method Article 50 Paragraph 2) when we install the information desk, model room performing application for contract acceptance

The last update date:

 Housing land and building dealer is place listed below pursuant to the provision of residential land building transactions business method Article 50 Paragraph 2, reception desks of execution of contract and offer of contract pertaining to residential land building transactions

Within ten days before day to start duties when is going to perform (please leave 10th. Actually, it is necessary to do Notifecations up to 11 days before. It has the same as follows.)

You must do Notifecations.

 In addition, Saga the Governer license supplier, please submit three copies to Part 2, the Minister of Land, Infrastructure and Transport, others prefectural governors license supplier Notifecations person.

 

Place where Notifecations is necessary

 1. It is thing except office at place having facility which can work continuously

  1.  2. The information desk when housing land and building dealer installs inquiry office, and they perform sale in lots of residential land of more than ten group or building of more than ten group
  2.  3. The information desk when we install inquiry office and perform substitution of 2 sales in lots that housing land and building dealer performs mentioned above or mediation
  3.  4. Place that carries out these events when there is when housing land and building dealer carries out event to be similar to these exhibition or other about duties

 

Attached file

 PDF Notification form We open with the other window(PDF: 252 kilobytes)

 

Instructions

 (1)Please attach maps (even as for copying of ZENRIN, possible) of the information desks for each notification form. In addition, attach them when there are brochure flyers

   Please give me.


 (2)It is up to one year that we can work at place targeted for this Notifecations. It is necessary to perform Notifecations some other time when we work sequentially.
 

 (3)When when "classification of duties" or "aspect of duties" is changed when we extend working period, full-time residential land building business person is changed,

   It is necessary to perform Notifecations some other time each time. In this case, about division number, the number of houses, area to list in "types of article" among notification forms, it is original

   Please list amount at point in time to perform new Notifecations after having listed thing pertaining to Notifecations with the upper section parenthesis book.

 (4)For one specific article, one bureau is principle.

 (5)We cannot hold the posts and full-time residential land building transactions person and full-time residential land building business person of office of place that this Notifecations is for.

 (6)Please submit notification form after having confirmed contents of qualifications residential land building business person directory of exclusive duty which is going to become residential land building transactions person. Address becomes distant place

   It may not be admitted that we reach, and engagement becomes other suppliers with full-time residential land building transactions person (in the metropolis and districts of registration by application of change

   Please go;).

 (7)When you do Notifecations by mail, please enclose self-addressed envelope (thing of stamp pasting finished) to send back reserve.

 


 

 

We relate to this page
Inquiry
(ID: 25660)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.