To the Saga synthesis top

About establishment of the Saga company construction appropriate conduct point

The last update date:

[April 22, 2016]

 We changed department name about "the Saga company construction appropriate conduct point" and the following explanation with organization revision of 2016.

※We corrected part of title in the point and style.

 

[January 20, 2010] About the Saga company construction appropriate conduct point

 By construction that the headquarters made with one prefecture of soil places an order for, we carry out separation ordering for clarification of construction responsibility and upbringing of specialized supplier.

  We set "the Saga company construction appropriate conduct point" to find appropriate construction about thing which needed construction (the company construction) by the contractor this time.

  This gist takes effect on January 20, 2010 and applies tender notice from object construction to perform after February 1, 2010.

  

[summary of the Saga company construction appropriate conduct point]

(1) With the company construction the company engineers ※We assume construction to depend on this.

(2) We state target construction clearly in conditions of contract of tender notice and special mention specifications.

(3) At the time of construction plan submission, engineers submit list notification form (the company employee).

(4) During construction period, we confirm whether you undertake construction in the company engineers as needed.

  ※The company engineers: "opere of "engineer playing a key role of main construction" in company and regular hiring or main construction equipment                 ta"

[supplement, additional material]

  • Definition of the types of job such as engineers in the company construction appropriate conduct point and work content (supplementary material) (※ H22.2.24)
  • Collection of Q&A about the company construction appropriate conduct point (※ H22.2.24)

Attached file

 
[addition, supplementary material]
We relate to this page
Inquiry
(ID: 25872)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.