To the Saga synthesis top

As for the construction, it is style of bid participation qualification items mentioned notification of change

The last update date:
 

 About prevention of infection spread of new coronavirus infectious disease

 

 About submission method of the items mentioned notification of change, we have you bring and accept submission by mail.

 From the viewpoint of prevention of infection spread of new coronavirus infectious disease, we hope that you examine about submission utilizing mail.

 

 


 When you change business name, the location, Name of Representative, phone number listed in ability for constructor enforcement class list of the prefecture, please submit the items mentioned notification of change to prefectural Construction & Technology Division immediately (bringing or mail).
 About style and attached documents, please see attached file.
 When we affect nomination and the contract, measures such as nomination stops may be performed based on "the measures point to stop nomination based on consignment contract contracts such as Saga construction" by leak of Notifecations. (please refer to the notice documentation dated September 1, 2014 in detail.)

 

[June 26, 2018 partial change]

We specified that we had you attach proxy when administrative scrivener reported.

 

[February 15, 2018 partial change]

When we had qualification of measurement proof business when we changed commission of the outside the prefecture construction-related work, we specified that registration document of the metropolis and districts with offices to entrust with was necessary.
We published style of proxy additionally.

 

[December 21, 2017 partial change]

We specified about submission of questionnaire about the investment situation and published style and mention example.

 

[October 03, 2017 partial change]

Conventionally, about documents which required attachment in notification of change which we listed in sentence, we gathered up in table format.

 

[September 05, 2014 partial change]

When we changed registration of section of the construction-related work, we added documents which reason to become grounds of change could confirm as attached documents.

We changed part of style of written oath.

 

[February 03, 2016 partial change]

We performed review of attached documents of the construction-related work. 

Attached file

Written oath With new window

 

We relate to this page
Inquiry
(ID: 25878)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.