To the Saga synthesis top

The measures points to stop nomination pertaining to consignment contract contract such as Saga construction, measures standard and the dealing with grievances procedure point (April 1, 2020)

The last update date:

   These points set necessary matter of person having qualification of competitive bidding participation of the prefecture about measures of the prefecture when there was act that does not deserve to be person of orders such as prefectural construction.

   About item which performed nomination stops, please see related link.

 

[summary (April 1, 2020) of revision]

<the measures point>

With civil law revision, we changed some expression.

[summary (April 1, 2016) of revision]

<the measures point>
It revised indispensability accompanied with organization revision of the prefecture dated April 1, 2016.

[summary (August 27, 2014) of revision]

<measures standard>
We added the following contents to Article 2 that prescribed the addition measures.

If "accident occurs within ten years after completion such as during period that we construct crude construction as cause or construction when we correspond to measures point separate table first No. 2 or No. 3 (crude construction), we consider the accident concerned to be accident that measures of safety management occurred by inappropriateness and shall add period to set of separate table of this standard in short term during period of measures point separate table first No. 2 or No. 3."

 

Attached file

We relate to this page
Inquiry
(ID: 25905)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.