The correspondence point (the April 1, 2016 enforcement) about unfair reporting demands about bid, contracts duties such as public construction

The last update date:

 About unfair reporting demands about bid, contracts duties such as public construction

Gist (summary) correspondence   of this

 

 Purpose

  About construction of prefectural ordering and bid, contract duties of construction-related business consignment,

Response to unfair reporting demand that the  staff receives from the inside and outside of the prefecture and pressure

 We set this and plan the fair nature of bid, contract duties and transparency.

 

 Act to correspond to unfair reporting demand and pressure

(1) Act to correspond to unfair reporting demand 

   About target price, the minimum limit price for violation of information of non-public announcement and laws and ordinances

Act that is going to get the next information that may   be connected out of the staff

(1) Name of participant companies and the number of competitive bidding

(2) All or a part of target price (in the case of subsequent public announcement), the design price and

hokakari and unit price that we do not announce  in advance

(3) Minimum limit price, low bidding price Surveys base price and low bidding price Surveys

All or a part of the  disqualification marker price

(4) Evaluation point pertaining to successful bidder decision of global assessment method

* Act not to correspond to unfair reporting demand

    Type, the spot condition of design amount, product based on fate such as tender notices

It is inquiries such as doubt, published multiplication standard    of this

(2) Act to correspond to unfair pressure

  Of next which may lead to violation of laws and ordinances for the staff about the bid execution

Act to perform  unfair pressure

(1) Pressure that is judged to lead to antisocial act including collusion

 

 Correspondence, record, public announcement

・ For reporting demand that the staff is unjust and demand that there is the suspicion,

 We do not reply directly.

  (except reporting demand that, as for the items carrying out such as tender notices, is unfair necessary

As for the   information, possible inquiry by document or E-mail by fate such as notification)

・ Of reporting demand that the staff is unjust or pressure and those doubt

We record contents and correspondence in blotter if we receive  a certain demand.

・ Participation in reporting demand that other prefectural officials are unjust as for the staff or pressure

 We report to the Governer or window by whistleblowing system if we know this.

・ Content of unfair reporting demand or pressure is published after confirmation at any time

 Do.

 

 Nomination stop

  Reporting that is going to get target price, the minimum limit price, and is unfair

When is admitted that  required, with or without information acquisition, is Saga

It is the measures point separate table second such as nomination stops pertaining to consignment contract contracts such as  prefectural construction

 (2) We carry out nomination stop pursuant to the provision of 4 of this (from 6 months to 12 months)

Attached file

We relate to this page
Inquiry
(ID: 25966)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.