To the Saga synthesis top

About notice about design multiplication book and public works of department and the point

The last update date:
     We publish about notice about public works of department and the point
[March 27, 2020]
・We devised "operation of design variation of overhead cost required for securing of worker".
・It revised "Saga weekly holiday 2nd trial construction conduct gist" partly.
・It revised "Saga ICT utilization construction trial gist" partly.
[January 23, 2020]
・We revised "the room period system conduct point in construction" partly. (next day → contract date hereof of the contract date hereof)
[November 22, 2019]
・We devised "room period system conduct gist in construction".
  PDF Special mention specifications mention example We open with the other window(PDF: 40.1 kilobytes)
  PDF Figure of room period system image We open with the other window(PDF: 236.8 kilobytes)
   ※Application: Construction to notify publicly after November 30, 2019
[October 23, 2019]
・We revised "Saga weekly holiday 2nd trial construction conduct gist" partly.
   ※Application: Construction to notify publicly after October 30, 2019
[July 23, 2019]
・We revised "Saga weekly holiday 2nd trial construction conduct gist" partly.
   ※Application: Construction to notify publicly after July 30, 2019
[July 1, 2019]
・We devised "trial gist of revision of the spot administrative expense to contribute to heat stroke countermeasures".
[April 1, 2019]
・We changed "the trial point of limit of quantity of holdings duties of management engineer and charge engineer". (we apply from April 1, 2019)
[February 20, 2019]
・We devised "Saga weekly holiday 2nd trial construction conduct gist".
・We devised "Saga ICT utilization construction trial gist".
[November 30, 2018]

・We changed "information sharing system operation guidelines". (addition of available system company)

[October 30, 2018]

・We devised "the spot environment improvement costs trial gist" (October, 2018).

  PDF The spot environment improvement costs trial point We open with the other window(PDF: 33.2 kilobytes)

・We devised "information sharing system operation guidelines" (October, 2018).

[May 30, 2018]

・We changed "the trial point of limit of quantity of holdings duties of management engineer and charge engineer". (we apply from May 30, 2018) 

[February 23, 2018]

・"Engineering works design duties formulated change guidelines" (February, 2018).

[December 15, 2016]

・We abolished trial gist and, with having switched over from trial to this operation about "design variation meeting", devised "the design variation meeting conduct point".

[June 1, 2016] 

・With cabinet ordinance which revised a part of the Construction Industry Act enforcement order about "the handling of additional posts such as the spot engineers", we revised part of attached file.

 
 

Attached file

PDF [the Forestry Agency jurisdiction] The trial point (July 1, 2019) of revision of the spot administrative expense to contribute to heat stroke countermeasures We open with the other window(PDF: 12.4 kilobytes) [R1.7.1 publication]

  • PDF The spot environment improvement costs trial point We open with the other window(PDF: 33.2 kilobytes) (H30.10.30 application) [H30.10.30 publication]
    PDF Engineering works design duties change guidelines (February, 2018) We open with the other window(PDF: 235.3 kilobytes) [H30.2.23 publication]
    PDF Guidelines We open with the other window(PDF: 1.4 megabytes) pertaining to construction suspension [H29.2.27 publication]
    PDF  The design variation meeting conduct point We open with the other window(PDF: 103.5 kilobytes) [H28.12.15 publication]
  • PDF Construction design variation guidelines We open with the other window(PDF: 197.9 kilobytes) (H28.2) [H28.1.19 publication]
    PDF The adjustment points We open with the other window(PDF: 135.8 kilobytes) such as indirect construction costs of proximity construction (H27.12.30 application) [H27.12.9 publication]
    PDF Quality standard of molten slag to use for reproduction heating asphalt mixture and the use standard (plan) We open with the other window(PDF: 141.2 kilobytes) [H27.10.1 publication]
    PDF Collection of trial point questions and answers of limit of quantity of holdings duties of management engineer and charge engineer We open with the other window(PDF: 24.9 kilobytes) [H30.4.11 publication]
    PDF The handling point We open with the other window(PDF: 169.5 kilobytes) of design variation in contract construction and commissioned business (H23.4.1 application) [H23.3.31 publication]
    PDF The temporary handling We open with the other window(PDF: 20 kilobytes) [H25.10.1 publication]

      

    Related link

    We relate to this page
    Inquiry
    (ID: 26131)
    Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
    Copyright© 2016 Saga Prefecture.All Rights Reserved.

    Saga prefectural government office (corporation number 1000020410004)

    〒840-8570
    1-1-59, Jonai, Saga-shi
    Tel: 0952-24-2111 (main)
    Copyright© 2016 Saga Prefecture.All Rights Reserved.