To the Saga synthesis top

Operation of inflation slide clause

The last update date:

 

 ◎About the headquarters ordering construction made with Saga prefecture soil inflation slide clause (Saga construction contract

    We decided to operate contract article Article 25 Paragraph 6).

    

 

    1. Construction that is targeted for application

       (1) "2 construction that there is from basic date to set of "(2) 2" zankoki to set in (3)" more than two months

         We intend for this.

       (2) Confirmation time of construction targeted for application of inflation slide by owner and person of order,

         It is said that change of wage level was accomplished.

 

    2. About request day and specified date

       Definitions such as request day and specified date are as follows.

        (1) Request day : Because slide change is possible, owner or person of order is contract

                 Discussion (we requested o called "slide discussion." as follows of change of the amount of price

                 It is day.

        (2) Basic date : We assume request day basics. But when is hard to stop at this, request

                 We reckon from day that there was, and owner and person of order discuss within 14 days

                 We set te.

        (3) zankoki : It is construction period after specified date.

 

    3. Request for slide discussion

      We perform request for slide discussion by the following styles. 

 

          Request material (style 1-1) by inflation slide clause from person of order With new window

 

     4. Instructions (H26.3 publication) at the time of request

        Request that person of order of construction targeted for discussion slides and discusses for inflation slide

      Dead work to do is necessary.

          (1)Making of "construction volume itemized statement" or "construction observance of a contract statement" (with conduct progress schedule)

            Confirm the progress of construction and result form, for design amount it is possible; quantity of form factor

            We gather this up. (necessary as information about the result form's confirmation.) 

          (2)Making of style 1-1

            (1)It is change request approximation and gaisanzankojiseifudaikingaku based on material which we made in this

            We calculate this and make style 1-1.

            ※Approximation may be changed as a result of close inspection. 

          (3)Rearranging of cover shot which can confirm the progress of construction and result form

          (4)Owner and confirmation harvest-shaped in basic date (basics, request day) to discuss, and to set

           We perform.

           On day to perform request day, please be decided in consideration of work to perform by basic date. 

            

                       

 

  

We relate to this page
Inquiry
(ID: 26153)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.