To the Saga synthesis top

The held situation of Saga public works project evaluation monitoring committee

The last update date:

The committee holding situation of 2019

 

 The date

 The main agenda

 Summary of committee

 The first   

   August 9, 2019   

  1.    1. About new evaluation of the shore business (maintenance system) (change of new evaluation manual)
  2.   ・Pro-maintenance [maintenance business] river, dam, shore (the construction shore) business (facility)
  3.  2. About the budget preparation situation of new evaluation conduct point
  4.  3. About simple post facto assessment conduct result
  5.  4. About effects of public works project
 SummaryWe open with the other window

 

The committee holding situation of 2018

 

The date 

The main agenda 

Summary of committee 

The first

August 9, 2018 

  1.  1. About new evaluation of the shore business (maintenance system) (change of new evaluation manual)
  2.   ・Pro-maintenance [maintenance business] river, dam, shore (the construction shore) business (facility)
  3.  2. About the budget preparation situation of new evaluation conduct point
  4.  3. About simple post facto assessment conduct result
  5.  4. About effects of public works project
 SummaryWe open with the other window

The second

December 6, 2018

 1. Report of evaluation conduct result new in 2018

  •  2. Explanation of public works project new evaluation individual district
  •  SummaryWe open with the other window

    On-site inspection

     December 20, 2018 

       On-site inspection of district targeted for reevaluation 

     SummaryWe open with the other window

    The third

     January 31, 2019

     1. About point targeted for 2018 public works project reevaluation

     2. About development of new evaluation manual and change

      ・[development] pro-maintenance [maintenance business] river business (dike)

      ・[change] pro-maintenance [life allied enterprise] city park business (facility maintenance)

     3. Additional report of evaluation conduct result new in 2018

     SummaryWe open with the other window

     

     

     

    The committee holding situation of 2017

     

     

    The date 

    The main agenda 

    Summary of committee 

     (June 1, 2017)

      Additional report of evaluation conduct result (maintenance system) new in 2016 Summary

      The first   

     July 20, 2017   

    1. About change of new evaluation manual
    2. About the budget preparation situation of new evaluation conduct point
    3. About simple post facto assessment conduct result
    4. About effects of public works project
     Summary

     On-site inspection

     October 26, 2017 

      

      On-site inspection of district targeted for reevaluation

     

     Summary

     The second

     November 22, 2017

     

     1. Report of evaluation conduct result new in 2017

  •  2. Explanation of public works project new evaluation individual district
  •  

     Summary

     The third

     January 24, 2018

      About question of district targeted for reevaluation

     Summary

     

     

    The committee holding situation of 2016

     

     

    The date 

    The main agenda 

    Summary of committee 

    The first 

    August 5, 2016 

    • About establishment of Saga public works project evaluation monitoring committee setting summary and the Saga public works project evaluation conduct point
    • About change of public works project new evaluation manual

     (1)Maintenance system [all business common denominator eyes]

     (2)Maintenance system [life allied enterprise (Prefectural housing maintenance business)]

     (3)Maintenance system [life allied enterprise (forestry conservancy business)]

     (4)Maintenance system [life allied enterprise (forest road business)]

    • Report of public works project new evaluation conduct result pertaining to 2016 original budget
    • Report (H21 year completion district) of post facto assessment result simple in 2015
     Summary
     The second November 18, 2016
    • Report of evaluation conduct result new in 2016
    • Explanation of public works project new evaluation individual district
    • Explanation such as effects of public works project in district targeted for simple post facto assessment in 2015
     Summary
     On-site inspection November 25, 2016 
    • On-site inspection of district targeted for reevaluation 
     Summary
       The third January 19, 2017
    • Additional report () of evaluation conduct result (maintenance system) new in 2016
    • About question of district targeted for reevaluation
     Summary

     

     

    The committee holding situation of 2015

     

    The date

    The main agenda

    Summary of committee

    The first 

    August 11, 2015

    • About addition of new evaluation manual (pro-maintenance [life allied enterprise] city park business)
    • We report as a result of original budget new point evaluation in 2015
    • We report as a result of simple post facto assessment in 2014
    • About effects of public works project

      Summary

    On-site inspection  October 29, 2015 
    • On-site inspection of district targeted for reevaluation 

    Summary 

    The second

    December 24, 2015 
    • Report of document deliberation result pertaining to change of maintenance system new evaluation manual
    • District question that is targeted for reevaluation 

    Summary 

    The third February 10, 2016 
    • About public works project new evaluation pertaining to 2016 original budget
    • Explanation of representative from new evaluation point business 

    Summary

     

    The committee holding situation of 2014

     

      The date The main agenda

    Of committee

    Summary 

    The first September 2, 2014
    • From new evaluation manual of pro-maintenance business about the abolition of new evaluation manual accompanied with business operation based on extension of life plan 
    • We report as a result of revised budget new point evaluation in original budget, June, 2014 in revised budget, 2014 in February, 2013
    • We report as a result of simple post facto assessment in 2013
    • About effect of public works project
     Summary

    The field

    Surveys 

    October 15, 2014
    • On-site inspection of district targeted for reevaluation
     Summary
    The second October 30, 2014
    • About partial revision of Saga reevaluation conduct summary
    • District question that is targeted for reevaluation 
     Summary
    The third  February 2, 2015 
    • As a result of new evaluation pertaining to 2015 original budget

            Be assigned to this 

     Summary
     

    The committee holding situation of 2013 

    The date

    The main agenda

    Committee

    It is summary of this

    The first

    October 7, 2013

    • H24 year February revised budget

          New point evaluation report

    • H25 year original budget

          New point evaluation report

    • H25 year June revised budget

          New point evaluation report

    • H25 year September revised budget

          New point evaluation report

    • Post facto assessment result report simple in the H24 year
    • Effect, PR of public works project

    Summary

     The field

     Surveys

    October 30, 2013  Reevaluation district on-site inspection Summary
    The second November 18, 2013   Reevaluation Summary 
    The third February 4, 2014

     February, 2013 revised budget, 2014

    Public works project for degree original budget formation

    New point evaluation result report

    Summary

    The committee holding situation of 2012

     

    The date

    The main agenda

    Summary of committee

     On-site inspection

    (the first) 

    April 19, 2012

     River overall development business

     (Ideguchi River dam) reevaluation

     On-site inspection 

      Summary

    The first

    April 19, 2012

     River overall development business

     (Ideguchi River dam) reevaluation

      Summary

    The second

    • October 4, 2012
    • Point evaluation report new in the H24 year
    • Post facto assessment result report simple in the H23 year
    • Effect, PR of public works project
      Summary

    On-site inspection

    (the second)

    October 15, 2012  Reevaluation district on-site inspection

      Summary

    The third

    October 31, 2012   Reevaluation   Summary 

    The fourth

    November 2, 2012 

     Reevaluation   Summary 

    The fifth

     February 12, 2013

     The Yobuko Port district harbor repair business

    (they district) reevaluation

      Summary

     

    The committee holding situation of 2011

     

    The date

    The main agenda

    Summary of committee

     The first 

    September 26, 2011

    Change of new evaluation manual 

    Summary

    On-site inspection

    October 11, 2011 On-site inspection of reevaluation district Summary

    The second

    October 26, 2011 Reevaluation Summary

     

    The committee holding situation of 2010

     

    The date

    The main agenda

    Summary of committee

     The first 

    October 28, 2010

    Change of new evaluation manual 

    Summary

    On-site inspection

    November 24, 2010 On-site inspection of reevaluation district Summary

     The second

    January 17, 2011 Reevaluation Summary

    The third

    February 7, 2011 Post facto assessment Summary

     

    The committee holding situation of 2009

     

    The date

    The main agenda

    Summary of committee

    The first

    September 3, 2009

    Change of new evaluation manual 

    Summary
     On-site inspection October 9, 2009  On-site inspection of reevaluation question district  Summary 

     The second

    October 16, 2009  Reevaluation  Summary 

     The third

    October 21, 2009  Reevaluation 

    Summary 

      The fourth February 9, 2010  Post facto assessment Summary

     

    The committee holding situation of 2008

     

    The date

    The main agenda

    Summary of committee

    The first

    September 10, 2008

    Change of new evaluation manual 

    Summary
     On-site inspection October 27, 2008  On-site inspection of reevaluation question district  Summary 

    The second

    October 30, 2008  Reevaluation  Summary 

    The third 

    November 12, 2008  Reevaluation  Summary 
       The fourth March 27, 2009  Post facto assessment  Summary 

     

    The committee holding situation of 2007

     

    The date

    The main agenda

    Summary of committee

    The first

    August 8, 2007 Change of new evaluation manual  Summary
    On-site inspection one group August 21, 2007 On-site inspection of reevaluation question district Summary

    On-site inspection two groups

    August 23, 2007 On-site inspection of reevaluation question district Summary

    The second

    August 24, 2007 Reevaluation Summary

    The third

    August 28, 2007 Reevaluation Summary

        The fourth

    March 25, 2008  Reevaluation and post facto assessment  Summary

     

     

    The committee holding situation of 2006

     

    The date

    The main agenda

    Summary of committee

    The first

    July 28, 2006 Change of new evaluation manual  Summary
    On-site inspection one group July 30, 2006 On-site inspection of reevaluation question district Summary

    On-site inspection two groups

    August 2, 2006 On-site inspection of reevaluation question district Summary

    The second

    August 4, 2006 Reevaluation Summary

     

     

    We relate to this page
    Inquiry
    (ID: 27458)
    Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
    Copyright© 2016 Saga Prefecture.All Rights Reserved.

    Saga prefectural government office (corporation number 1000020410004)

    〒840-8570
    1-1-59, Jonai, Saga-shi
    Tel: 0952-24-2111 (main)
    Copyright© 2016 Saga Prefecture.All Rights Reserved.