About establishment of the Saga construction results rating public announcement point

The last update date:
 We established "the Saga construction results rating public announcement point" that set matter about public announcement about evaluation (says "rating point" as follows.) of rating of construction results that we evaluated based on examination of Saga public works point Article 9, building, facilities construction inspection point Article 12 Paragraph 1 and building, facilities taskmaster point Article 12 Paragraph 1 and construction technical degree of difficulty.

 This point applies from construction notifying of based on Saga construction results rating notice point (we say "the notice point" as follows.) Article 3 after April 1, 2016.

April 1, 2016

Contents of the Saga construction results rating public announcement point

(1) We do construction publicizing rating point with construction notifying of based on notice point Article 3.

 

(2) We shall perform public announcement of rating point by reading "construction results rating notification" which we notified based on notice point Article 3 in each ordering engine.

 

(3) Explanation request for construction results rating office action period to fix start of reading for notice point Article 4 later, we shall perform immediately. But when there is submission of request for explanation based on point Article 5, doyoryodai 

  After having notified the contractor concerned of the result if we revise rating points to set of after the answer to request for explanation to fix for Article 6 or point Article 7, we shall start immediately.

    We do the end of reading of construction results rating office action with the next end of the fiscal year in the year of day when we started reading.

 

(4) Person to read decides to list the requirements in reading receptionist book.

 

(5) As a general rule, we shall not accept request for explanation about construction results rating office action that we published. 

 

 

Attached file

PDF The Saga construction results rating public announcement point We open with the other window(PDF: 83 kilobytes)

 

 

Supplementary material

PDF The Saga construction results rating notice point We open with the other window(PDF: 103.2 kilobytes)

PDF The examination of Saga public works point We open with the other window(PDF: 117.4 kilobytes)

PDF Construction, the facilities construction inspection point We open with the other window(PDF: 123.2 kilobytes)

PDF Building, the facilities taskmaster point We open with the other window(PDF: 134.1 kilobytes)



We relate to this page
Inquiry
(ID: 45165)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.