To the Saga synthesis top

We understand bids such as Saga construction (April 1, 2019 partial revision)

The last update date:
 Of "bid knowledge as for Saga construction" revised a part.
 Bid knowledge after revision takes effect on April 1, 2019. 
 
[this revised contents]
We revised words to consumption tax rate increase.
We added description pertaining to provisional measure accompanied with consumption tax rate increase.
 
[revised contents of June 1, 2016]

 About chief engineer and control engineer, cabinet ordinance revising a part of the Construction Industry Act enforcement order on June 1, 2016 is enforced,

As Construction Industry Act enforcement order Article 2, 4 and Article 27 Paragraph 1 of Article 7 were revised, we revised words to that.

Attached file

PDF Understand bids such as Saga construction (for pocketbook bill); We open with the other window(PDF: 250.7 kilobytes)

PDF Entry examples We open with the other window(PDF: 46.9 kilobytes) such as bidding forms

Word Construction cost itemized statement entry example We open with the other window(word: 41.5 kilobytes)

 

  • It is share until March 31, 2019
  • PDF Saga construction bid knowledge (for e-bidding) We open with the other window(PDF: 244.8 kilobytes)
  • PDF Saga construction bid knowledge (for pocketbook bill) We open with the other window(PDF: 245.8 kilobytes) 


       

      We relate to this page
      Inquiry
      (ID: 48611)
      Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
      Copyright© 2016 Saga Prefecture.All Rights Reserved.

      Saga prefectural government office (corporation number 1000020410004)

      〒840-8570
      1-1-59, Jonai, Saga-shi
      Tel: 0952-24-2111 (main)
      Copyright© 2016 Saga Prefecture.All Rights Reserved.