To the Saga synthesis top

We publish post facto assessment (middle evaluation) of social capital general maintenance plan

The last update date:
 

About post facto assessment (middle evaluation) of social capital general maintenance plan

 At the time of the end of grant period, we evaluate the realization situation of aim of social capital general maintenance plan, and local public entity which carried out business by social capital maintenance synthesis grant announces this and is required to report to the Minister of Land, Infrastructure and Transport.

 

In addition, we evaluate as needed in the middle year of grant period, and it is decided to perform public announcement and report to the Minister of Land, Infrastructure and Transport equally. (1 of the social capital maintenance synthesis grant grant summary tenth)

 

 

About post facto assessment result of social capital general maintenance plan

Results of post facto assessment (middle evaluation) of social capital general maintenance plan are as follows.

 

 

[post facto assessment]

PDF The whole area (industry, production functional enhancement) in Saga We open with the other window(PDF: 197.5 kilobytes)

PDF Promotion (disaster prevention, security) Emergencies countermeasures We open with the other window(PDF: 120.3 kilobytes) of the inundation countermeasures by river business that became the whole prefectural soil and the shore business

PDF Saga social capital maintenance plan (HOPE plan) We open with the other window(PDF: 71.2 kilobytes)

 

[middle evaluation]

To date there is no middle plan that we evaluated.

We relate to this page
Inquiry
(ID: 49614)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.