To the Saga synthesis top

Reevaluation result of 2016

The last update date:
 

The third Saga public works project evaluation monitoring committee

District material which is targeted for reevaluation

 

 Number

 Business name

(the district name or the point name) (municipalities name)

 Reevaluation reason Explanation material Report
 1

 Waste sea surface disposal ground maintenance business

(Imari Port Uranosaki district) (Imari-shi)

 Fold after the reevaluation conduct after five years

 Continuation

 

 

 Number

 Business name

(the district name or the point name) (municipalities name)

 Reevaluation reason Explanation material Report
 1

 Subsidence countermeasures business under prefectural management 

(Middle Saga district) (Saga-shi, Ogi-shi) 

 Fold after the reevaluation conduct after five years                      Continuation

 

 

 Number

 Business name

(the district name or the point name) (municipalities name)

 Reevaluation reason Explanation material Report
 1

Road maintenance grant business

(social capital maintenance synthesis grant)

(general Route 498) (Wakagicho, Takeo-shi)

 Fold after the business adoption after ten years

PDF Road Division individual record (1) We open with the other window(PDF: 106.2 kilobytes)

PDF Road Division explanation material (1) We open with the other window(PDF: 618.1 kilobytes)

 Continuation

 2

 Road maintenance grant business

(social capital maintenance synthesis grant)

(general prefectural road Taradake Park line) (Tara, Tara-cho)

 Fold after the business adoption after ten years

 PDF Road Division individual record (2) We open with the other window(PDF: 102.1 kilobytes)

 PDF Road Division explanation material (2) We open with the other window(PDF: 582.6 kilobytes)

 Continuation
 

 3

 

 Road maintenance grant business

(social capital maintenance synthesis grant)

(main country path Takeo Fukutomi lines) (Fukudomi, Shiroishi-cho)

 As social economic situation changed PDF Road Division individual record (3) We open with the other window(PDF: 107.6 kilobytes)
 PDF Road Division explanation material (3) We open with the other window(PDF: 1.43 megabytes)
 Continuation
 4 Road maintenance grant business

(social capital maintenance synthesis grant)

(general prefectural road Higashiyoga Saga line) (Honjochou, Saga-shi)

 As social economic situation changed PDF Road Division individual record (4) We open with the other window(PDF: 106.7 kilobytes)

 PDF Road Division explanation material (4) We open with the other window(PDF: 1.21 megabytes)

 Continuation

 

We relate to this page
Inquiry
(ID: 52942)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.