To the Saga synthesis top

Procedure pertaining to the building energy saving method

The last update date:

 

Summary of law about energy consumption performance gain of building

 Other systems took effect on recognition system, April 1, 2017 and, about law (we say the building energy saving method as follows.) about energy consumption performance gain of building, were started on April 1, 2016. These legal main systems are as follows.

 

 [attention]

  ※With a part of the revised building energy saving law having been enforced on November 16, 2019, style is changed.

  ※Please check the latest style basket before submission. 

  ※For more information about law revision, please refer to the Ministry of Land, Infrastructure, Transport and Tourism homepage.

   Page (the Ministry of Land, Infrastructure, Transport and Tourism homepage) of the building energy saving method We open with the other window(external link)

 

(1) About building energy consumption performance compatibility judgment

  About large-scale non-house building (special-use building) conformity duty to energy consumption performance standard in at the time of new construction and compatibility judgment duty

(2) About Notifecations based on the building energy saving method

  About middle size or more buildings, it is Notifecations duty of energy saving plan in at the time of new construction

(3) About recognition system

 a) Authorization (floor area ratio exception) of building energy consumption performance improvement plan

  In at the time of new construction, repair of building, we receive conformity authorization from government agency with jurisdiction to instruction standard and can receive special exception of floor area ratio.

  (we can receive authorization about cooperation of plural buildings with oneself and others supply type heat source apparatuses)

 b) Authorization (indication of energy consumption performance) pertaining to energy consumption performance of building

  We receive authorization of government agency with jurisdiction and, about existing building adapting to energy consumption performance standard, can display so.

 

(1) About building energy consumption performance compatibility judgment

 In the master of building, it is necessary to receive building energy consumption performance compatibility judgment to judge that securing of building energy consumption performance plan adapts to building energy consumption performance standard (after that we say "energy saving standard".) before starting the construction if we are going to do specific building act targeted for conformity duty.

 Government agency with jurisdiction or registration building energy consumption performance judgment organization can perform building energy consumption performance compatibility judgment. In addition, about plan of target building, it becomes possible to apply to the same engine for building certification and building energy consumption performance compatibility judgment.

 
※Please refer to the following site for registration building energy consumption performance judgment engine which assumes the Saga prefecture the sphere of business.
 

Application window

 When we are applied to Saga (building act except Saga-shi), engineering works office of each jurisdiction becomes reception counter.

 
 

Application window

Address 

 Phone number

 Jurisdiction area

 Saga Construction Office Building Control Section

 2-2-67, Yae, Saga-shi 0952-24-4369 Ogi-shi, Taku-shi

 Eastern Construction Office Building Control Section

 1234-1, Motomachi, Tosu-shi  0942-83-4398

 Tosu-shi, Kiyama-cho, Kamimine-cho

 Miyaki-cho, Kanzaki-shi

 Yoshinogari-cho

 Karatsu Construction Office Building Control Section

 3-1-5, Futago, Karatsu-shi 0955-73-2865 Karatsu-shi, Genkai-cho

 Imari Construction Office management section

 122-4, Shintencho, Imari-shi 0955-23-4721 Imari-shi, Arita-cho

 Kitou Construction Office Building Control Section 

 265, Takeochoshowa, Takeo-shi 0954-22-4185

 Takeo-shi, Omachi-cho, Kouhoku-machi

 Shiroishi-cho, Kashima-shi, Ureshino-shi

 Tara-cho

 

 

Application books

(1) Application of building energy consumption performance compatibility judgment

 You attach design books such as drawings and check of energy saving performance to application, and please submit plus, vice-no two copies. Copy is returned with grant of conformity judgment office action when we can confirm compatibility to energy saving standard.

 

(2) Submission of compatibility judgment office action to chief architects

 You attach plan of copy to conformity judgment office action, and please submit. Plan of copy is returned when we can confirm building standard prescribed conformity of relationships.

 

(3) Application of plan change, slight change pertinence proof application

 You attach design books such as drawings and design book before check of energy saving performance and change and copying of change part of check to application, and please submit plus, vice-no two copies. Copy is returned with grant of compatibility judgment office action or slight change pertinence certificate when we can confirm compatibility to energy saving standard.

 

(4) Completion inspection application

 You attach design book and check, energy saving standard construction control report returned to application in building energy consumption performance compatibility judgment just before that, and please apply. When there is change from plan that received building energy consumption performance compatibility judgment, you attach conformity judgment notification after change, immaterial alteration manual, minimal change pertinence certificate as needed, and please apply. Documents which were attached when we finish examination of completion are returned.

 

We change plan of

  When there is basic change of plan, plan change is necessary before the start of construction. Application window is the same as window of plan at first.

 

Immaterial alteration

(1) Range of change

 Ranges of immaterial alteration less than plan change are as follows.

 Change (route A) that a energy saving performance improves

 Change (route B) that energy saving performance in constant range decreases in the plan having energy saving performance b uniformity or more

 Change (route C) that it is clear to meet energy saving standard by recomputation of energy saving performance except the c above

 

(2) Slight change pertinence certificate

 The master of building can apply for issuance of certificate of corresponding to immaterial alteration (route C). Application window is the same as window of plan at first. In addition, application is possible regardless of time of the start of construction and the completion if there is before examination of completion. 

 

Fee

 We change building energy consumption performance compatibility judgment, plan of, and fee pertaining to slight change pertinence certificate application is as follows.

In addition, we may not stop by as follows when use of building is "factory, warehouse". For more details, please refer to each window.

 

Style about building energy consumption performance compatibility judgment

 

(2) About Notifecations based on the building energy saving method

 When we perform the following building acts, within 21 days before construction start day, it is necessary to report plan about structure for securing of energy consumption performance of building and facilities to government agency with jurisdiction.

  • New construction when floor space except part having patency that is high for fresh air is 300 square meters or more

 (except case to become building energy consumption performance compatibility judgment)

  • Extension and/or alteration when extension and/or alteration areas except part having patency that is high for fresh air are 300 square meters or more

 (except case to become building energy consumption performance compatibility judgment)

 

Notifecations procedures

1 Notifecations window

 About Notifecations to Saga (building act except Saga-shi), each engineering works office becomes window. (it has the same as application of building energy consumption performance compatibility judgment)


2 Notifecations books

 You attach design books such as drawings and check of energy saving performance to notification form, and please submit plus, vice-no two copies. After having confirmed compatibility to energy saving standard, copy is returned.

 

 3 change Notifecations

 When there is change before the completion of plan that we reported, in notification of change is necessary. Notifecations window is the same as original Notifecations window.

 

Style about Notifecations

 

(3) About recognition system


 Authorization of a) building energy consumption performance improvement plan

 The master of building makes plan (building energy consumption performance improvement plan) about new construction of building for energy consumption performance gain by place to set in the Ministry of Land, Infrastructure, Transport and Tourism ordinance if we are going to do the enlargement, reconstruction of building for new construction of building contributing to energy consumption performance gain or energy consumption performance gain or repair and can apply to government agency with jurisdiction for authorization. About constant floor space that will exceed floor space of normal building, the basics of floor area ratio calculation and floor space where it is cannot count by taking measures to contribute to energy consumption performance gain about building which caught authorization.

 

 Authorization pertaining to energy consumption performance of b) building

 Owner of building can apply to government agency with jurisdiction for authorization of adapting to building energy consumption performance standard about the building concerned by what to establish in the Ministry of Land, Infrastructure, Transport and Tourism ordinance. About building which caught authorization, we can show we receive the authorization concerned.

 

Procedure for authorization 

 Authorization of a) building energy consumption performance improvement plan

 Application of authorization is possible for new construction of building or the enlargement, reconstruction or repair.

 (we can receive authorization about cooperation of plural buildings with oneself and others supply type heat source apparatuses.)

  • It is necessary to do certification application procedure before starting construction to receive authorization.
  • In the case of apartment house, it becomes application by house ridge or dwelling unit unit.
  • Fee is needed for in certification application.
  • As for the standard application procedure, it is procedure to apply to government agency with jurisdiction (Saga) for after having received technical examination for Examining Authority beforehand.
  • Please inquire for procedures when you do not receive technical examination beforehand.

 Authorization pertaining to energy consumption performance of b) building

  • Application of authorization is possible about new planned building, but, other than existing building, will be authorized after the completion of building.
  • In the case of apartment house, it becomes application by house ridge unit.
  • Fee is needed for in certification application.
  • As for the standard application procedure, it is procedure to apply to government agency with jurisdiction (Saga) for after having received technical examination for Examining Authority beforehand.
  • Please inquire for procedures when you do not receive technical examination beforehand.

 

※Examining Authority: Technical examination of non-house part in non-house building or compound building registration housing performance evaluation engine as for the technical examination of registration building energy consumption performance judgment engine or housing part in compound building

 

Application window

 As it becomes Saga prefectural government office Architecture & Housing Division unlike building energy consumption performance compatibility judgment and Notifecations, please be careful.

 

Certification application fee

 Authorization of building energy consumption performance improvement plan and authorization pertaining to energy consumption performance of building are as follows.

 We receive technical examination of Examining Authority, and we attach identification of conformity to issue of Examining Authority, and fee when we apply is amount in case of following *goshoyu to Saga.

 

Styles such as certification applications

We relate to this page
Inquiry
(ID: 54507)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.