To the Saga synthesis top

We raised and, about "house, ru" support project, were finished. There is no offer after 2019.

The last update date:

 We make child care, and grand province "Saga" "house, ru" support project supports the acquisition of house for three generations living together, close residence which can bring up child while helping each other between generations, house for child care households utilizing empty house which area is wide, and is easy to do child care and remodeling to promote the residence environment creation which is easy to do child care, but it is the end of the business in 2018, and, as for the offer in after 2019, there are none.

House support menu of selectable child care household 

 ↓Please click favorite menu.

A: Support menu to the third generation living together, close residence of child care household

(1)New construction (including the purchase) of house                            Up to 500,000 yen supporting (note) living together, close residence type

(2)Existing home purchase + reform(※1)                     Up to 800,000 yen supporting (note) living together, close residence type

(3)Reform of existing house(※1)                       Up to 500,000 yen assistance (note) living together model

 

B: Support menu to empty house inflection of child care household

(1)Single-family house empty house purchase + reform(※1)                 Up to 800,000 yen assistance (note)

(2)Single-family house lease house reform that single-family house space home owner performs(※1)      Up to 400,000 yen assistance

(note) have emigration costs 100,000 yen by household unit from Saga outside the prefecture to the prefecture.

 

※About 1 reform, it is 2. Please confirm construction targeted for assistance to reform.

 Figure of flow
                                      (figure of flow)

 

Each support contents and target person 

 
New construction (including the purchase) of A-(1) house (living together, close residence type)

(support contents)

As new construction (including purchase ※) of house It is 400,000 yen uniformly
From Saga outside the prefecture to the prefecture as emigration expense by household unit It is 100,000 yen uniformly

※When we encounter the purchase, we limit to thing which we have never offered in the past for one of a person's residence

(target people)

  • We strike living together, close residence (note 2) in three generations (grandparents of parent and child and child) including child care household (note 1)
  • Applicant being member of household of child care household or member of household of grandparents household
  • Applicant being contractor of the house concerned
  • Total income amount of money of the previous year of applicant being less than 5 million yen
  • Until February 28, 2019 or business being completed, and being able to submit completion results report by either early day until less than 30 days
  • By authorization of long-term excellent house or design house performance evaluation of extension of life item and house performance item be satisfied in higher than one each
  • Thing that is 100 square meters of deferred floor space (in the case of close residence 75 square meters) or more in the case of detached residence
  • Thing that is 75 square meters of deferred floor space (in the case of close residence 55 square meters) or more in the case of apartment house (including tenement house)
  • Applicant being contractor performing construction (the purchase) pertaining to the supporting business concerned
  • In the case of house new construction, submission of contract is necessary at the time of thing (note) application performing conclusion of contract pertaining to the supporting business concerned at the time of application.
Household (including pregnant household where person is) where under 18 years old are to housemate note 1 in April 1, 2018
The shortest distance in a straight line of site of thing or house where grandparents of parent and child and child live in note 2 in equivalence elementary school precinct almost live in (※) less than 2 kilometers
※: We almost assume 10%.
 
 
[) attaching both documents (word and PDF necessary for application]
 
2018 business
 (at the time of the results report)

 

We return to menu

 

 
A-(2) existing home purchase + reform (living together, close residence type)

(support contents)

 As the purchase expense of existing home It is 300,000 yen uniformly
 As reform expense (the basic supporting + addition assistance) Up to 400,000 yen
 From Saga outside the prefecture to the prefecture as emigration expense by household unit It is 100,000 yen uniformly

 (target people)

  • We strike living together, close residence (note 2) in three generations (grandparents of parent and child and child) including child care household (note 1)
  • Applicant being member of household of child care household or member of household of grandparents household
  • Applicant being contractor of the house concerned and reform construction
  • Total income amount of money of the previous year of applicant being less than 5 million yen
  • Until February 28, 2019 or business being completed, and being able to submit completion results report by either early day until less than 30 days
  • Being existing home (note 3) where the present situation Surveys such as the deterioration situation was carried out or existing home to carry out before the results report
  • Having earthquake-resistant performance when it was built in old earthquake proofing standard before 1981 (that possible in this supporting business when we carry out earthquake-resistant repair work)
  • Expenses required for the purchase being 3 million yen or more
  • Thing that is 100 square meters of deferred floor space (in the case of close residence 75 square meters) or more in the case of detached residence
  • Thing that is 75 square meters of deferred floor space (in the case of close residence 55 square meters) or more in the case of apartment house (including tenement house)
  • Expenses required for overall reform construction being 500,000 yen or more (when he/she purchases existing home, it is for reform)
  • Applicant being contractor performing construction (the purchase) pertaining to the supporting business concerned
Household (including pregnant household where person is) where under 18 years old are to housemate note 1 in April 1, 2018
The shortest distance in a straight line of site of thing or house where grandparents of parent and child and child live in note 2 in equivalence elementary school precinct almost live in (※) less than 2 kilometers
※: We almost assume 10%.
House where people live in note 3 (they have lived)
 
 
[) attaching both documents (word and PDF necessary for application] 
2018 business
(at the time of change application)

 

We return to menu

 
 
Reform (living together type) of A-(3) existing house

(support contents)

 As reform expense (the basic supporting + addition assistance) Up to 400,000 yen
 From Saga outside the prefecture to the prefecture as emigration expense by household unit It is 100,000 yen uniformly

 (target people)

  • Live together in three generations (grandparents of parent and child and child) including child care household (note 1). We become a target during living together now.
  • Applicant being member of household of child care household or member of household of grandparents household
  • Applicant being contractor of the reform construction concerned
  • Total income amount of money of the previous year of applicant being less than 5 million yen
  • Until February 28, 2019 or business being completed, and being able to submit completion results report by either early day until less than 30 days
  • Having earthquake-resistant performance when it was built in old earthquake proofing standard before 1981 (that possible in this supporting business when we carry out earthquake-resistant repair work)
  • Thing that is 100 square meters of deferred floor space or more in the case of detached residence
  • Thing that is 75 square meters of deferred floor space or more in the case of apartment house (including tenement house)
  • Expenses required for overall reform construction being 500,000 yen or more
  • Applicant being contractor constructing pertaining to the supporting business concerned
Household (including pregnant household where person is) where under 18 years old are to housemate note 1 in April 1, 2018
 
 
[) attaching both documents (word and PDF necessary for application] 
2018 business
(at the time of change application)
(at the time of the results report)

 

We return to menu

 
B-(1) single-family house empty house purchase + reform 

(support contents)

 As the purchase expense of single-family house empty house It is 300,000 yen uniformly
 As reform expense (the basic supporting + addition assistance) Up to 400,000 yen
 From Saga outside the prefecture to the prefecture as emigration expense by household unit It is 100,000 yen uniformly

 (target people)

  • Being the residence in child care household (note 1)
  • Applicant being contractor of the reform construction concerned
  • Total income amount of money of the previous year of applicant being less than 5 million yen
  • Until February 28, 2019 or business being completed, and being able to submit completion results report by either early day until less than 30 days
  • Being single-family house empty house (note 4) where the present situation Surveys such as the deterioration situation was carried out or single-family house empty house to carry out before the results report
  • Having earthquake-resistant performance when it was built in old earthquake proofing standard before 1981 (that possible in this supporting business when we carry out earthquake-resistant repair work)
  • Expenses required for the purchase being 3 million yen or more
  • Deferred floor space being 75 square meters or more (when he/she purchases single-family house empty house, it is for reform)
  • Expenses required for overall reform construction being 500,000 yen or more
  • Applicant being contractor performing construction (the purchase) pertaining to the supporting business concerned
Household (including pregnant household where person is) where under 18 years old are to housemate note 1 in April 1, 2018
Detached residence which we offer for one of the residence in the past, and resident is not at the time of this delivery of subsidies application note 4
 
 
[) attaching both documents (word and PDF necessary for application] 
2018 business
(at the time of change application)
(at the time of the results report)

 

We return to menu

 

 
Single-family house lease house reform that B-(2) single-family house space home owner performs 

(support contents)

 As reform expense (the basic supporting + addition assistance) Up to 400,000 yen

 (target people)

  • Being single-family house space home owner (in register) who leases to child care household after having remodeled single-family house empty house to own because child care household (note 1) resides
  • Being single-family house empty house to lease for child care households
  • Until February 28, 2019 or business being completed, and being able to submit completion results report by either early day until less than 30 days
  • Having earthquake-resistant performance when it was built in old earthquake proofing standard before 1981 (that possible in this supporting business when we carry out earthquake-resistant repair work)
  • You limit to child care household from offer start for six months, and assume single-family house empty house to lease
  • Deferred floor space being 75 square meters or more
  • Expenses required for overall reform construction being 500,000 yen or more
  • Applicant being contractor constructing pertaining to the supporting business concerned
Household (including pregnant household where person is) where under 18 years old are to housemate note 1 in April 1, 2018
 
 
[) attaching both documents (word and PDF necessary for application] 
2018 business
(at the time of change application)
(at the time of the results report)

 

We return to menu

 

About performance that is equal to construction targeted for assistance to reform and authorized long-term excellent house

(target reform construction)
(1) All or some repair, repair, reinforcement, redecoration such as houses, update (exchange) construction
(2) It is the enlargement or construction to rebuild with a part of the houses
※The enlargement, floor space of reconstruction part enlarge a building and remove construction more than floor spaces of existing part after reconstruction
 
(construction such as house performance improvements)
(1) Earthquake-resistant repair work such as houses
(2) Energy saving repair work such as houses
(3) Barrier-free repair work such as houses
 
(performance that is equal to authorized long-term excellent house)
[detached residence]
Extension of life item: Deterioration countermeasures class (structure skeletons) ⇒ class 3, maintenance countermeasures class ⇒ class 3
House performance item: More than earthquake proofing class (prevention such as collapse of structure skeleton) ⇒ class 2, as for the insulation, it is performance class ⇒ class 4
 
[apartment house and tenement house]
Extension of life item: Deterioration countermeasures class (structure skeletons) ⇒ class 3, maintenance countermeasures class (the exclusive plumbing 1) ⇒ class 3, update countermeasures (part for exclusive use of house) ⇒ skeleton ceiling 2,650mm in height or more
House performance item: More than earthquake proofing class (prevention such as collapse of structure skeleton) ⇒ class 2, as for the insulation, it is performance class ⇒ class 4
※We remove gas pipe
 
About detailed contents, please confirm the following attached file

 

PDF With target reform construction ... We open with the other window(PDF: 20.6 kilobytes)

PDF With construction such as house performance improvements ... We open with the other window(PDF: 23.6 kilobytes)

PDF With performance that is equal to authorized long-term excellent house ... We open with the other window(PDF: 7.2 kilobytes)

 

(person corresponding to each next issue cannot receive assistance)

(1) That performed construction start such as new construction or reform construction of house before delivery of subsidies decision
    ※We confirm start day by the spot confirmation or contract.
(2) That performed the sales contract conclusion pertaining to the purchase of house and the purchase of existing home, the purchase of single-family house empty house before delivery of subsidies decision
    ※We confirm the contract date hereof by contracts.
(3) Person who is doing Saga tax delinquency
        ※At the time of application, person lived in outside Saga does not need nonpayment certificate.
(4) Country like this business and prefecture, municipalities (going to inflect when there is, we include) utilizing subsidies
    ※When reform construction part and expense are cut into pieces definitely, case not to receive other delivery of subsidies is excluded
    ※When you repeat with similar assistance to each municipality and apply, please confirm by all means in each municipality
   ・Supporting business that we can use together
    House stipend
   ・Supporting business that we cannot use together
    Country: Is green; business, ZEH business, reform business long-term excellent house, assistance business such as business to perform other Saga of each municipality utilizing public funds
    PDF List of 2018 house assistance business (as of 30.4.1) We open with the other window(PDF: 202 kilobytes) ※Please confirm in subsidy counter in charge using together by all means directly

(5) Which until February 28, 2019 or business is completed and cannot submit completion results report to by either early day until less than 30 days
(6) False application or other injustice which applied for subsidy by means
(7) Gang or gangster or gang and gangster and person who has implications
 

Schedules from application of subsidy to grant

Subsidy grant application      
  ↓                         ※All the offers ended in 2018.
The application acceptance, contents examination   
  
Subsidy grant decision      ※The first grant decision day: June 13, 2018
             ※The second grant decision day: September 10, 2018            
  ↓                 
The grant notice of determination acceptance   
  
Start (contract of the purchase) of construction ※Please perform start (contract of the purchase) of construction by all means after grant decision notice day
  ↓         ※When we perform start (contract of the purchase) of construction before grant decision, we do not become a target of assistance
            ※When application contents have change, change application is necessary
Completion of construction (contract)              
  
The results report        ※Completion results report needs submission by until February 28, 2019 or day when business is completed, and it is quick in either until less than 30 days
  
Reception desk, examination of the results report ※In submission deadline of the results report, it is February 28, 2019
            ※As you cannot receive assistance when you cannot submit the results report by time limit, please be careful enough
  ↓         
 
Decision of supporting amount of money     ※When contents do not have defect, after the results report submission, we send decision office action of sum from the prefecture
  
Request for subsidy      ※You list number, date listed in decision office action of sum, and please submit bill to the prefecture     
  ↓         
Payment of supporting amount of money    ※It takes around three weeks before transfer
 
 

About the present situation Surveys (inspection)

 Authorized architects who received constant class along "existing house inspection guidelines" that the Ministry of Land, Infrastructure, Transport and Tourism set of the present situation Surveys (inspection), and passed completion examination (say "examination for existing house present situation engineer". Authorized architect (we say "existing house situation Surveys engineer".who completed class that the same training agency which country registered by) or existing house situation Surveys engineer class registration regulations carried out as follows It is the present situation inspection of the same existing house which) performs as follows.
 
About existing house situation Surveys engineer class system, please confirm from following HP.
 
About registered existing house situation Surveys engineer, please confirm now from following HP.
 

Interest rate preferential treatment (at the time of menu (A-1, A-2 mentioned above, the house acquisition of B-1)) of home loan [flat 35] by home-financing support mechanism

 When contents of cooperation have child care and perform the acquisition (A-1, A-2) of house for living together, close residence and the acquisition (B-1) of existing house by youth child care household only for user of grand province "Saga" "house, ru" support project, we can receive interest rate kind treatment (a fixed period of time interest rate cut) of home loan [flat 35] by home-financing support mechanism.

 

 Interest rate cut plan

Interest rate cut period 

 Loss discounted by interest

 [flat 35] Child care support type

 Original five years

[flat 35] It is age ▲ 0 from debt interest rate of this. 25% 

 

 After having you submit "use of [flat 35] child care support type application" to Saga on the use of this preferential treatment ([flat 35] child care support type), and having received grant of "use of [flat 35] child care support type object certificate" from the prefecture, it is necessary to have you submit "use of [flat 35] child care support type object certificate" to financial institution before borrowing contract. 

 

Figure of flows ... from ... interest rate preferential treatment application to interest rate preferential application

 

(1)"House, ru" support project subsidy grant application

  

(2)"House, ru" support project subsidy grant decision

  

(3)[flat 35] We submit use of child care support type application to prefectural (counter in charge)

  

(4)Certificate targeted for use of [flat 35] child care support type is issued later

  ↓          

(5)[flat 35] We submit certificate targeted for use of child care support type to financial institution by financing run time

※As interest rate privilege may not catch this application for flat 35 in the case of before 2018, ask financial institution on this occasion.

 

(various use applications)

It is for A-1, A-2 (living together type)

Excel [flat 35] Is for A-2 for use of child care support type application A-1 (living together); We open with the other window(Excel: 72 kilobytes)

PDF [flat 35] Is for A-2 for use of child care support type application A-1 (living together); We open with the other window(PDF: 134 kilobytes)

It is for A-1, A-2 (close residence type)

Excel [flat 35] Is for A-2 for use of child care support type application A-1 (close residence); We open with the other window(Excel: 70.9 kilobytes)

PDF [flat 35] Is for A-2 for use of child care support type application A-1 (close residence); We open with the other window(PDF: 133.2 kilobytes)

It is for B-1 (age of ※ applicant people 40 years or older are not available)

Excel [flat 35] Use of child care support type application (for B-1) We open with the other window(Excel: 67.5 kilobytes)

PDF [flat 35] Use of child care support type application (for B-1) We open with the other window(PDF: 116.9 kilobytes)

Home-financing support mechanism homepage We open with the other window(external link)

 

(offer period)

All the offers ended in 2018. There is no offer after 2019.

 

(application method)

All the offers ended in 2018. There is no offer after 2019.

 

(summary, style relations)

PDF "House, ru" support project Q&A We open with the other window(PDF: 396 kilobytes)

PDF Supporting summary (H30 year version) We open with the other window(PDF: 237.5 kilobytes) 

PDF Slight notification of change We open with the other window(PDF: 204.5 kilobytes)

※When grant decision contents have immaterial alteration without change (changes of ※ construction place)

PDF Cancellation (the abolition) notice We open with the other window(PDF: 201.2 kilobytes)

※When grant is decided person, and business is canceled

※When business is not completed within allowance period

PDF The succession Notifecations We open with the other window(PDF: 52.7 kilobytes) of agent

※When, in doing application by agent, construction companies contracting with in the business middle are changed

 

 

Make child care; grand province "saga" We open with the other window(external link)

Approach about empty house

Guidance of earthquake-resistant diagnosis assistance

Thing We open with the other window(external link) about long-term excellent house

Thing We open with the other window(external link) about design house performance evaluation

House reform support system search site We open with the other window(external link) in local public entity

Saga security house support center We open with the other window(external link)

Home-financing support mechanism We open with the other window(external link)

The Ministry of Land, Infrastructure, Transport and Tourism [news about the house taxation system] We open with the other window(external link)

Nursing insurance consultation counter [Local Elderly Care Management Center] about use of reformWe open with the other window

 

 

We relate to this page
Inquiry
(ID: 54616)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.