To the Saga synthesis top

The Saga construction conditioning open bid conduct point and the handling standard (April 1, 2019 (Heisei 31) application)

The last update date:

It revised part of Saga construction conditioning open bid conduct point.

About this revision, we apply from thing notifying publicly after April 1, 2019 (Heisei 31). 

About the conduct point after revision, please see attached file.

 

[main revised contents (April 1, 2019 (Heisei 31))]

・About the handling that we are prohibited from participation in same bid, we clarify that we remove outside directors from limit object of officer of human relations as well as the handling of the Ministry of Land, Infrastructure, Transport and Tourism from point of view called execution of duty of officer.

 

[main revised contents (July 30, 2018 (Heisei 30))]

・We add descriptions about trial of global assessment successful bid method to a part of paving work and the landscape gardening construction.

・We adjust points deviating from notation of homepage of the current prefecture.

・We add walls to make it easy to read

 

[main revised contents (August 23, 2017 (Heisei 29))]

About type of industry of eligibility requirements of target districts in the handling standard, we delete black kite, earthwork (the dismantling) construction and add the dismantling construction newly.

 

[main revised contents (April 1, 2017 (Heisei 29))]

There is to plan ordering by (notice of date*gidai 1599 issue Land development manager dated December 14, 2016) about "the special measures paperwork point of bid, contract system pertaining to 2016 Emergencies economic measure business and zero prefectural debt business" in the bid (price competition bid) that is not global assessment successful bid method in early stage of construction when we perform shortening during bid procedure period and performs shortening during bid procedure period in 2016 from April 1, 2017 whether and Emergencies economic measure business is zero prefectural debt business.

 

[main revised contents (April 1, 2016 (Heisei 28))] 

(1) In the bid of prejudging type, we decide not to demand submission of copying of general rating scale value result office action pertaining to management matter examination.

(2) In the pocketbook bill only by bid by e-bidding or mail, we bid by simple substance company (we include ordinary construction joint venture.) item and specific construction joint venture item

       It is decided that bid cancellation does not intend when participant is 1 person.

 

[main revised contents (September 15, 2015 (Heisei 27))] 

  • About eligibility requirements of target districts in the handling standard, we add participation requirements of the associate prefecture company in electric construction, tubing newly

 

[main revised contents (April 1, 2015 (Heisei 27))] 

  • We add style to be able to do record date to e-bidding system with on the application day concerned or Notifecations day when we submit bid participation qualification confirmation application or bid participation notice by e-bidding system.

  • Revision of ordering standard every division of type of construction and class.

  • Revision of standard of building complete set construction and electric construction about architecture and similar construction pertaining to tubing. 

  •  
We relate to this page
Inquiry
(ID: 56268)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.