To the Saga synthesis top

Please identify electric person constructing by all means by oneself

The last update date:

 

New registration to prefectural governors (note) is necessary to continue everything or some construction in response to request from someone else repeatedly by oneself, and to perform electric construction (in general electric workpiece or private electric workpiece) except setting or construction (slight construction to change). Registration period is five years. When we run electric construction after the registration termination of the term sequentially, registration of renewal is necessary. Person who receives permission of construction industry, and runs electric construction comes to need start Notifecations to prefectural governors (note). In addition, change Notifecations is necessary with permission update of construction industry.

Note: When we install place of business as well as Saga

  •      (1)In the case of department in one industrial preservation supervision, (chisel in Kyushu) is Manager Director Kyushu industrial preservation

  •      (2)When sit astride area of industrial preservation supervision department two or more; (when install place of business outside Kyushu) is Minister for Economy, Trade and Industry

  • heno registration, Notifecations is necessary.

    • About electrician business application

       

    We relate to this page
    Inquiry
    (ID: 57034)
    Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
    Copyright© 2016 Saga Prefecture.All Rights Reserved.

    Saga prefectural government office (corporation number 1000020410004)

    〒840-8570
    1-1-59, Jonai, Saga-shi
    Tel: 0952-24-2111 (main)
    Copyright© 2016 Saga Prefecture.All Rights Reserved.