To the Saga synthesis top

We will tell about held result of "we wait for Saga in 2018 and inspect people, work construction Comprehensive Strategy and hold a meeting"

The last update date:

 We held "2018 Saga town, people, job construction Comprehensive Strategy inspection meeting" to inspect the progress about "Saga town, people, work construction Comprehensive Strategy" which we devised in September, 2015.

 We refer to on examining future measure about opinion that we had.

 

Summary> of <inspection

 (1) About Saga town, people, work construction Comprehensive Strategy

 (2) About local construction-related grant (local construction acceleration grant, local construction promotion grant and local construction base maintenance grant)

 (3) About the local construction support taxation system (Furusato Nouzei for company)

 

<main opinion>
 PDF According to the attachment We open with the other window(PDF: 30.7 kilobytes)

 

<member list>

 PDF According to the attachment We open with the other window(PDF: 15.6 kilobytes)

 

We relate to this page
Inquiry
(ID: 65043)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.