To the Saga synthesis top

Toward the constructor accepting an order of public construction as original contractor (management matter examination relations)

The last update date:
   

Toward "the constructor accepting an order of public construction as original contractor" (management matter examination relations)

 

 [with management matter examination]

  When we are going to undertake public construction directly, it is examination said to have to receive by all means.

  

  When is going to undertake public construction that country, local public entity place an order for with 23 of Construction Industry Act Article 27 directly, must undergo by all means, "the community

 Each ordering organization of construction is considered to be that they perform screening about constructor who is going to participate in competitive bidding.

 Score does "objective matter" and examination result of "evaluation according to owner" (general score) after having examined whether you do not correspond to disqualification requirements in this screening,

Rating is carried out. Examination equal to "objective matter" of these is "management matter examination".

 As it is thing which should turn out same even if any ordering organization performs this "management matter examination", specific third party examines based on uniformity standard integrally

Because thing is effective, and this examination itself is related to construction industry administration closely again, permission administrative agency pertaining to construction industry permission carries out examination by Construction Industry Act

It is decided to do.

 

 [examination basic date]

  As a general rule, by management matter examination, (the settling day just before that) on the end of day becomes examination basic date for fiscal year just before applying day. Of fiscal year in examination basic date just before that

 When we have already reached new examination specified date at the time of application because it is the end day, we cannot receive examination in conventional examination basic date.

 

 [validity]

  After having received result office action (management matter examination) for validity of management matter examination, it is between examination basic date of the management matter examination and one year seven months. These; "seven one year

 We are reckoned from examination basic date, and period of month is not period after we receive result office action.

  We receive management matter examination to assume the settling day after one year seven months ago of the contract date hereof basic date and, as a result, notify order (making a contract with owner) of public construction

 It is necessary to receive grant of book.

  This is required for order itself of public construction with or without bid participation qualification of public construction owner.

  Therefore, need to receive management matter examination after the financial statements immediately every year so that validity continues without break when we are going to undertake public construction directly every year

 There is. 

 

 ※As validity of management matter examination is one year seven months from day (= examination basic date) of the end of the business year regardless of application (reception desk) day, application (reception desk) is late

  Case, "period not to be able to undertake public construction as original contractor" may occur.

  In addition, wrong recognition to receive management matter examination once in two years is founded as bid participation qualification application of the prefecture is carried out once in two years.

 ※It is necessary to apply for management matter examination so that validity continues and uses as the guide and prepares to apply four months after day of the end of in business year

  Please perform this (within one month before applying for prejudging filing of paper).

 ※As, as for the management matter examination, examination basic date targeted for application is done with day of the end of in business year just before application day, for example, is examination standard on December 31, 2018

  We cannot apply for day and application to do after January 1, 2020 (when we do after January 1, 2020 with application day on day of the end of the business year just before that Heisei

  Because it is December 31, 2019;). 

 

 [about public announcement of management matter examination result]

  Management matter examination result is falsehood application by security of equity by more improvement of transparency of the community construction bid participation applicant choice procedure, disclosure of company information and mutual monitoring

 We announce of this from point of view such as inflection of deterrent.

 

 [about punitive clause of false application and administrative action]

  About thing which we make false entry in submission documents of management matter examination and submitted, we become a target of supervision disposal based on Construction Industry Act Article 28. In addition, by case

 This is sentenced to criminal charges such as imprisonment, fine based on Construction Industry Act Article 50.

 

 [about rearranging of type of industry]

  Attached sheet, please refer to "about way of thinking of type of industry".

 

 [other instructions]

  ・Please submit after confirming the items mentioned of documents at the time of application enough.

  ・After receipt of result office action, I would like confirmation with application mention contents immediately.

  ・When, by errors on the administrative (examination) agency side, contents of result office action (management matter examination) are different from application contents

   If it is less than 30 days, we can file reexamination from day when we received result office action (we do not include business condition analysis that registration business condition analysis organization performed).

  ・About item "that omission of entry and entry error of applicant or contents approval or disapproval by lack of confirmation documents at the time of application comes to responsibility of" applicant, it is object ninarima of reexamination

We    do not do.

 

 [attachment]

 About application procedure for management matter examination

 PDF About way of thinking of type of industry We open with the other window(PDF: 1.88 megabytes)

 PDF About way of thinking of type of industry (the dismantling construction) We open with the other window(PDF: 186.7 kilobytes)

 PDF Instructions We open with the other window(PDF: 73.6 kilobytes) in management matter examination application

 About application procedure for management matter examination

 PDF List of references We open with the other window(PDF: 7.1 kilobytes)

 PDF (reference) Guide We open with the other window(PDF: 1.97 megabytes) of kyuji*keieijikoushinsa

 

 

 

We relate to this page
Inquiry
(ID: 67068)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.