To the Saga synthesis top

Reevaluation result of 2018

The last update date:
     

The third Saga public works project evaluation monitoring committee

District material which is targeted for reevaluation

 

 

 Number

 Business name

(the district name or the point name)

 Reevaluation reason Explanation material Report
 1

 Coastal protection facility maintenance business

(large Takuma)

 Fold after the reevaluation conduct after five years

PDF Rural & Fishing Area Division explanation material (large Takuma) We open with the other window(PDF: 630.1 kilobytes)

 Continuation
 2

 Coastal protection facility maintenance business

(south Kawazoe)

 Fold after the reevaluation conduct after five years Continuation
 3

 Coastal protection facility maintenance business

(kokuzo)

 Fold after the reevaluation conduct after five years Continuation
 4

 Coastal protection facility maintenance business

(west Kawazoe)

 Fold after the reevaluation conduct after five years Continuation
 5

 Coastal protection facility maintenance business

(Higashiyoga)

 Fold after the reevaluation conduct after five years Continuation
 6

 Coastal protection facility maintenance business

(Kubota)

 Fold after the reevaluation conduct after five yearsPDF Rural & Fishing Area Division individual record (Kubota) We open with the other window(PDF: 66.4 kilobytes) Continuation
 7

 Coastal protection facility maintenance business

(kairiko)

 Fold after the reevaluation conduct after five years Continuation
 8

 Coastal protection facility maintenance business

(the beach)

 Fold after the reevaluation conduct after five years Continuation
 9

 Coastal protection facility maintenance business

(shichiura)

 Fold after the reevaluation conduct after five years Continuation
 10

 Coastal protection facility maintenance business

(Higashi-Yamashiro)

 Fold after the reevaluation conduct after five years

PDF Rural & Fishing Area Division individual record (Higashi-Yamashiro) We open with the other window(PDF: 65.2 kilobytes)

PDF Rural & Fishing Area Division explanation material (Higashi-Yamashiro) We open with the other window(PDF: 538.2 kilobytes)

 Continuation

 

 

 Number

 Business name

(the district name or the point name)

 Reevaluation reason Explanation material

Report

 1

 Road maintenance grant business

(social capital maintenance synthesis grant)

 Imari field Kyuuragi, Sendai Line (flat Yamashita)

 When it passed after the business adoption in five years

 For non-start of construction

PDF Road Division explanation material (flat Yamashita) We open with the other window(PDF: 743.2 kilobytes)

Continuation

 2

 Road maintenance grant business

(social capital maintenance synthesis grant)

 Saga Outer Beltway (lower Izumi)

 Fold after the business adoption after ten years                     

Continuation

 3

 Road maintenance grant business

(social capital maintenance synthesis grant)

 Fuji Maehara line (upper nothing Tsuro)

 Fold after the business adoption after ten years                     

PDF Road Division explanation material (upper nothing Tsuro) We open with the other window(PDF: 640.5 kilobytes)

Continuation

 4 Road maintenance grant business

(social capital maintenance synthesis grant)

 Morotomi Nishijima line (Kurozu)

 Fold after the business adoption after ten years 

Continuation

 5 Road maintenance grant business

(social capital maintenance synthesis grant)

 *gaseshinsen (Hyogo)

 Fold after the reevaluation conduct after five yearsPDF Road Division individual record (Hyogo) We open with the other window(PDF: 57.9 kilobytes)

Continuation

 6 Road maintenance grant business

(disaster prevention, safe grant)

 Ogi Ushizu Line (inanimate object)

 Fold after the reevaluation conduct after five years

Continuation

 7 Road maintenance grant business

(social capital maintenance synthesis grant)

 Morotomi Nishijima line (Mukaishima)

 Fold after the reevaluation conduct after five years

Continuation

 

 Road improvement business

 Takeo Fukutomi line (Fukutomi)

 As social economic situation changedPDF Road Division individual record (Fukutomi) We open with the other window(PDF: 59.1 kilobytes)

Continuation

 

 

 Number

 Business name

(the district name or the point name)

 Reevaluation reason Explanation material

Report

 1

 Park maintenance grant business

(Yoshinogari Historical Park)

 Fold after the reevaluation conduct after five years

PDF Urban Planning Division explanation material (Yoshinogari Historical Park) We open with the other window(PDF: 1.35 megabytes)

Continuation

 

 

 Number

 Business name

(the district name or the point name)

 Reevaluation reason Explanation materialReport
 1

 River maintenance grant business

(wide area river repair business) (Ko Honjo)

 Fold after the reevaluation conduct after five years

PDF River & Sediment Control Division individual record (Ko Honjo) We open with the other window(PDF: 72.3 kilobytes)

PDF River & Sediment Control Division explanation material (Ko Honjo) We open with the other window(PDF: 808.1 kilobytes)

Continuation

 2

 River maintenance grant business

(general basin disaster prevention business) (Sashi River)

 Fold after the reevaluation conduct after five years

PDF River & Sediment Control Division individual record (Sashi River) We open with the other window(PDF: 72.7 kilobytes)

PDF River & Sediment Control Division explanation material (Sashi River) We open with the other window(PDF: 1.06 megabytes)

Continuation

 3

 River maintenance grant business

(wide area river repair business) (wide Tagawa)

 Fold after the reevaluation conduct after five years

PDF River & Sediment Control Division individual record (wide Tagawa) We open with the other window(PDF: 107.9 kilobytes)

PDF River & Sediment Control Division explanation material (wide Tagawa) We open with the other window(PDF: 647.1 kilobytes)

Continuation

 4 River maintenance grant business

(wide area river repair business) (Kiridoshi River)

 Fold after the reevaluation conduct after five years

Continuation

 5

 River maintenance grant business

(wide area river repair business) (Saga Egawa)

 Fold after the reevaluation conduct after five years

Continuation

 6

 River maintenance grant business

(wide area river repair business) (cold water river)

 Fold after the reevaluation conduct after five years

Continuation

 7

 River maintenance grant business

(wide area river repair business) (Tade River) 

 Fold after the reevaluation conduct after five yearsPDF River & Sediment Control Division individual record (Tade River) We open with the other window(PDF: 114.9 kilobytes)

Continuation

 8 River maintenance grant business

(general basin disaster prevention business) (Hamakawa)

 Fold after the reevaluation conduct after five yearsPDF River & Sediment Control Division individual record (Hamakawa) We open with the other window(PDF: 72.3 kilobytes)

Continuation

 9 River maintenance grant business

(general basin disaster prevention business) (Machida River)

 Fold after the reevaluation conduct after five years

Continuation

 10 River maintenance grant business

(general basin disaster prevention business) (Ushizu Egawa)

 Fold after the reevaluation conduct after five years

Continuation

 11 River maintenance grant business

(general basin disaster prevention business) (Kawazoe River)

 Fold after the reevaluation conduct after five years

Continuation

 12 River maintenance grant business

(general basin disaster prevention business) (fine weather going river)

 Fold after the reevaluation conduct after five years

Continuation

 

We relate to this page
Inquiry
(ID: 67854)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.