To the Saga synthesis top

We revised memorandum based on agreement about ensuring safety of Genkai Nuclear Power Plant

The last update date:

In the prefecture, we conclude agreement (safe agreement) about "safety ensuring of nuclear power plant with ensuring safety of around Genkai nuclear power plant local resident between situation of environmental conservation and Genkai-cho and Kyushu Electric Power Co.,Inc. and, also, we set "memorandum based on agreement about safety ensuring of nuclear power plant" and plan the appropriate operation.

 

With revisions of this laws and ordinances concerned, we revised a part of the memorandum today on October 25.

 

[revision details]

  • With revised ("Industrial Standardization Law" changes to "the industrial standardization method") of the JIS method, we change "Japanese Industrial Standards" to "Nihon Sangyo standard"
  • With revised (the text addition) of "law about regulation of nuclear raw materials material, nuclear fuel material and nuclear reactor", we change the prescribed text number quoting for memorandum
  • In reference to revised contents (changes such as styles) of regulations about reports such as radiation management from company to country concerned, we review report styles from Kyushu Electric Power to prefecture and Genkaicho and report time

 

 

In addition, there is no revision about safe agreement.

In the prefecture, we confirm the driving situation of Genkai Nuclear Power Plant through appropriate operation of safe agreement and memorandum continuously.

 

Attachment

We relate to this page
Inquiry
(ID: 71253)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.