 Saga environment radioactivity technology meeting

 On the date

 Tuesday, November 26, 2019

 From 14:00 to 16:10

 Holding place

(the location) 2-1-36, Tenjin, Saga-shi

(venue name) Grande the first floor of hagakure harmony hall A

 Attendant

[committee member]
 Idemitsu committee member, oka﨑iin, Sugihara committee member, Tanabe committee member, *iin, Nakajima committee member
[the secretariat, the person concerned]
○Saga [Section Manager Morooka (Nuclear Safety Division), Director Nonaka (Environmental Research Center), Section Manager Eguchi (Karatsu Public Health and Welfare Office), Chief Eguchi (Genkai Fisheries Promotion Center) others 12]

○Genkai-cho [Chief Furutachi (disaster prevention security section)]
○Karatsu-shi [handenharakoryokutaisakukan (crisis management countermeasures room)]
○Atomic energy regulation agency [two Director Kikukawa (Genkai atomic energy regulation office) others]
○Kyushu Electric Power [14 Shinohara Manager of Management Department Riki Harako (nuclear power generation headquarters) others]

 Public deliberation in Houses, secrecy Exhibition
 Meeting closed reason 
 Summary of meeting

[the proceedings matter]

・By material 1-1-1, 1-1-2, abnormality caused by Genkai nuclear power plant explained that it was not admitted with space radiation and radioactivity in environmental sample about environmental radioactivity findings from July to September from prefectural Environmental Research Center and Kyushu Electric Power in 2019.

・As it was supposed with cause, by material 1-1-3, delinquent of temperature properties by aged deterioration explained that we were handled as reference about measurements for the phenomenon developmental period about change of measurements of ionization chamber-type detector from prefectural Environmental Research Center.

 There was advice that you should list current manufacturer name which carried out Surveys from oka﨑iin and responded that we revised from Environmental Research Center.

 There were not working definitely, advice such as having self-fever from Tanabe committee member in high temperature as property of general semiconductor element and replied that we considered in future Surveys from Environmental Research Center.

・By material 1-1-4, prefectural Environmental Research Center explained examination result about crosscheck in strontium analysis.

・By material 1-2, prefectural Genkai Fisheries Promotion Center explained on*suikagehibikichosaketsuka of the summer in 2019.

 There was indication that expression in figure 2-1 of material 1-2 was incomprehensible from oka﨑iin and responded that we revised from Genkai Fisheries Promotion Center.

・By material 1-3, there was explanation from Kyushu Electric Power about Genkai Nuclear Power Plant peripheral sea area environmental research result of spring, the summer in 2019.

・There was not objection from committee member for the proceedings matter.

[report matter]

・By material 2, prefectural Nuclear Safety Division reported state of implementation of the driving situation of Genkai nuclear power plant from July to September and the abolition measures in 2019.

 There was indication that style of (1)-table 2 of material 2 and (2)-table 2 was incomprehensible from oka﨑iin and responded that we revised from Nuclear Safety Division.

[others]

・By material 3-1, 3-2, there was explanation from Kyushu Electric Power about the abolition measures state of implementation of 1, Genkai and 1, Genkai, the abolition measures plan of 2.

 Material of meeting
 Reference   Department in charge Department of Citizens and Environmental Affairs Nuclear Safety Division    

 Telephone 0952-25-7081 (direct)

 FAX 0952-25-7269

 E-mail genshiryokuanzentaisaku@pref.saga.lg.jp

 

We relate to this page
Inquiry
(ID: 72149)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.