To the Saga synthesis top

We replied Kyushu Electric Power about transportation of Genkai Nuclear Power Plant low-level radioactive waste in 2019 (the prior consent)

The last update date:
 Based on agreement Article 4 about ensuring safety of nuclear power plant, we responded that we understood according to the attachment about low-level radioactive waste transportation plan of Genkai nuclear power plant which there was of request for prior consent with ritsu Komi book No. 452 dated December 26, 2019 to Kyushu Electric Power from Kyushu Electric Power on February 5, 2020.

 

(from Kyushu Electric Power please understand in advance)

We relate to this page
Inquiry
(ID: 72812)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.