 Name of meeting that we held

 Saga environment radioactivity technology meeting

 On the date

 From Tuesday, February 4, 2020 15:00 to 16:40

 Holding place

(the location) 2-10-43, Matsubara, Saga-shi
(venue name) Between the third floor of *kashinshakinenkan Aioi, robe of an angel

 Attendant

[committee member]
  oka﨑iin, Sugihara committee member, Tanabe committee member, *iin, Matsuyama committee member, Morita committee member, Yamaguchi committee member
[the secretariat, the person concerned]
 ○Saga [Section Manager Morooka (Nuclear Safety Division), Director Nonaka (Environmental Research Center), Chief Eguchi (Genkai Fisheries Promotion Center) others 12]
 ○Genkai-cho [Section Manager Kano (disaster prevention security section)]
 ○Karatsu-shi [high bottom vice-chief examiner (crisis management Disaster Prevention Section)]
 ○Atomic energy regulation agency [Kinoshita seat of honor radiation disaster prevention specialty official (Genkai atomic energy regulation office)]
 ○Kyushu Electric Power [12 Shinohara Manager of Management Department Riki Harako (nuclear power generation headquarters) others]

 Public deliberation in Houses, secrecy Exhibition
 Meeting closed reason 
 Summary of meeting

[the proceedings matter]
・By material 1-1-1,1-1-2, abnormality explained that it was not admitted with space radiation and radioactivity in environmental sample about environmental radioactivity findings from October to December from prefectural Environmental Research Center and Kyushu Electric Power in 2019.
・By material 1-1-3, there was explanation from Kyushu Electric Power about parallel result of a measurement accompanied with update construction of monitoring post.
・There was advice that factor might understand from Sugihara committee member if we analyzed spectrum about there being difference in measurements with old and new facilities, and Kyushu Electric Power answered when they considered about conduct.
・By material 1-2, prefectural Nuclear Safety Division explained environmental radioactivity Surveys plan of 2020.
・By material 1-3, prefectural Genkai Fisheries Promotion Center explained on*suikagehibikichosakeikaku of 2020.
・There was explanation from Kyushu Electric Power about Genkai Nuclear Power Plant peripheral sea area environmental research plan of 2020.
・There was not objection from committee member for the proceedings matter.

[report matter]
・By material 2, prefectural Nuclear Safety Division reported state of implementation of the driving situation of Genkai nuclear power plant from October to December and the abolition measures in 2019.

[others]
・By material 3-1, there was explanation from Kyushu Electric Power about the abolition measures state of implementation of 1, Genkai.
・By material 3-2, there was explanation from Kyushu Electric Power about outbreak of fire in Genkai transformer substation.

 Material of meeting
 Reference

   Department in charge Department of Citizens and Environmental Affairs Nuclear Safety Division

 Telephone 0952-25-7081 (direct)

 FAX 0952-25-7269

 E-mail genshiryokuanzentaisaku@pref.saga.lg.jp

 

We relate to this page
Inquiry
(ID: 72959)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.