To the Saga synthesis top

About taking two days off at the weekend trial construction in repairs construction

The last update date:
 Toward realization of work-style reform of construction industry, we carry out "the taking two days off at the weekend enforcement construction" in the repairs construction of Saga from March, 2020.
  • During the target period, we find the spot blind alley day where is beyond rest for 8 for four weeks "to take two days off at the weekend", and perfection blind alley does the construction spot.
  • "Target period" is periods (in summer holidays, factory production periods are excluded for New Year holidays.) from construction start day to construction completion day.
  • The spot calls state made blind alley "the spot blind alley day" including work in the spot office except patrol patrol or maintenance check throughout the day. 

 

■ Construction that is targeted for trial

 Among Department of Land Development Architecture & Housing Division ordering construction, we stated that it was taking two days off at the weekend construction clearly in special mention specifications by the following construction.

  • Building complete set construction design price 50 million yen or more
  • Building facilities construction (electric construction and tubing) design price 12 million yen or more

 In addition, we limit when we separate the same on the site plural construction and place an order when all construction to separate, and to order meets the condition mentioned above.

 But, about the following construction, construction targeted for trial is not intended.

  ・It is construction with limitation in the completion time and working hour

  ・Urgent construction such as disaster recovery efforts 

 

■ Ordering method

 We adopt request for person of order method (method to work on after it takes two days off at the weekend, and person of order discussed that we work for owner before construction start).

 In addition, we carry out when plural construction isolates in one construction spot and are placed an order after person of order of all trial object construction agreed after the contract. 

 

■ Application

 We apply from construction to notify publicly after March 1, 2020.

 But proposal can already cope by change based on this point about thing which there was from person of order before the construction start day even if it is notification, construction placed an order for.

 

■ Others

  • Clear statement of being "taking two days off at the weekend trial construction" is necessary for indication signboards of the construction spot.
  • When we carry out the taking two days off at the weekend enforcement construction, we carry out monitoring and carry out questionary survey to person of order as of construction completion day.
  • When we can achieve the spot blind alley where is beyond rest for 6 for four weeks, revision (increase) does labor cost by correction factor that accepted the results of the spot blind alley day.
  • In addition, we add in the construction results rating and, depending on the results of the spot blind alley day, evaluate. (there is no deduction when we were not able to be accomplished.)

 ※For more details, please confirm the following conduct points.

We relate to this page
Inquiry
(ID: 73265)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.