Reevaluation result of 2019

The last update date:
 

The third Saga public works project evaluation monitoring committee

 

District material which is targeted for reevaluation

 Figure of business point position targeted for business point table, reevaluation targeted for material 1PDF 2019 public works project reevaluation We open with the other window(PDF: 1.99 megabytes)

 ・Way of thinking We open with the other window(PDF: 80.6 kilobytes) of material 2 Ports & Harbors DivisionPDF Ports & Harbors Division public works project reevaluation question point table, B/C

 

 Number

 Business name

(the district name or the point name) 

 Reevaluation reason  Explanation material  Report 

 Harbor maintenance business

(Sashi district)

 Fold after the reevaluation conduct after five yearsPDF Ports & Harbors Division individual material (Sashi district) We open with the other window(PDF: 64.3 kilobytes) Continuation
2

 Harbor maintenance business

(Donggang district)

 Fold after the reevaluation conduct after five yearsPDF Ports & Harbors Division individual record (Donggang district) We open with the other window(PDF: 70 kilobytes) Continuation 

 

 

  ・Way of thinking We open with the other window(PDF: 77.9 kilobytes) of material 3 Forestry Preservation DivisionPDF Forestry Preservation Division public works project reevaluation question point table, B/C

 

 Number

 Business name 

(the district name or the point name)

 Reevaluation reason  Explanation material  Report 
 1 The forest base maintenance grant business

 Fold after the business adoption after ten years

PDF Forestry Preservation Division explanation material (extension on the corner) We open with the other window(PDF: 556.9 kilobytes)

 Continuation
 2 Preventive forestry conservancy business As social conditions changed Continuation
 3 The forest base maintenance grant business Fold after the business adoption after ten years PDF Forestry Preservation Division individual material (Mt. Eboshi Line) We open with the other window(PDF: 96.9 kilobytes)
PDF Forestry Preservation Division explanation material (Mt. Eboshi Line) We open with the other window(PDF: 683.1 kilobytes)
 Continuation

 

 

 ・Way of thinking We open with the other window(PDF: 94.7 kilobytes) of material 4 Road DivisionPDF Road Division public works project reevaluation question point table, B/C

 

 Number

Business name 

(the district name or the point name)

Reevaluation reason Explanation material  Report
 1Road maintenance grant business 

 When it passed after the business adoption in five years

For non-start of construction

PDF Road Division individual material (Morotomi Nishijima line) We open with the other window(PDF: 109.7 kilobytes) Continuation
 2Road maintenance grant business  Fold after the reevaluation conduct after five yearsPDF Road Division individual material (Saga loop east line) We open with the other window(PDF: 161.6 kilobytes)
PDF Road Division explanation material (Saga loop east line) We open with the other window(PDF: 829.4 kilobytes)
 Continuation
 3Road improvement business  Fold after the reevaluation conduct after five yearsPDF Road Division individual material (Fukutomi Kashima Line) We open with the other window(PDF: 26.7 kilobytes) Continuation
 4 Road maintenance grant business Fold after the reevaluation conduct after five yearsPDF Road Division individual material (Tobou bypass) We open with the other window(PDF: 173.7 kilobytes)
PDF Road Division explanation material (Tobou bypass) We open with the other window(PDF: 797.5 kilobytes)
 Continuation
 5 Road maintenance grant business Fold after the reevaluation conduct after five yearsPDF Road Division individual material (Takeo Fukutomi line) We open with the other window(PDF: 127.6 kilobytes)
PDF Road Division explanation material (Takeo Fukutomi line) We open with the other window(PDF: 577.1 kilobytes)
 Continuation

 

 

 ・Way of thinking We open with the other window(PDF: 155.5 kilobytes) of material 5 River & Sediment Control DivisionPDF River & Sediment Control Division public works project reevaluation question point table, B/C

 

 Number

 Business name

(the district name or the point name)

Reevaluation reason Explanation material  Report 
 1

 River maintenance grant business

(wide area river repair business) (Takeo River)

 Fold after the reevaluation conduct after five years  Continuation
 2 River maintenance grant business

(general basin disaster prevention business) (Nishitagawa)

 Fold after the reevaluation conduct after five years Continuation

 3

 River maintenance grant business

(general basin disaster prevention business) (medium-grade articles river)

 Fold after the reevaluation conduct after five years Continuation

 



 

 

 

 

We relate to this page
Inquiry
(ID: 74022)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.