About special measures in Construction Recycling Law accompanied with outbreak of disaster caused by July, 2020 heavy rain

The last update date:

About this, there was notice from the Ministry of Land, Infrastructure, Transport and Tourism real estate, construction economic agency construction industry section manager according to the attachment by country non--based No. 34 dated July 15, 2020.

When we arrive, we will tell as we decided to take the following measures along notice of attachment.

 

Note

 

[summary]

Based on regulations of the right profit maintenance method, we take measures such as extension of validity period of registration targeting at registration suppliers (we say "registration supplier" as follows.) of the dismantling construction work based on Construction Recycling Law which we suffered from by heavy rain in July, 2020.

 

[target constructor]

➀Registration supplier having office which is main in "specific disaster area" where the Disaster Relief Act was applied to in July, 2020 by heavy rain

(2)Person that unavoidable circumstances caused by heavy rain is detected in registration supplier who does not have main office in "specific disaster area" in July, 2020

 

[necessary procedure]

We decide to submit written reasons of having suffered by heavy rain in July, 2020 to undergo the following measures.

 

[contents of measures]

➀About extension of validity period of registration of the dismantling construction work

 We decide to appoint date until December 28, 2020 in (we say "case that performed proposing" afterward) when victim of heavy rain performs proposing of extension by document which listed reason to need extension of validity period in July, 2020, and to extend the date of expiration.

(thing that validity of registration expires between R2.7.3 - R2.12.27 is best.)

 

(2)About submission of notification of change

We decide not to ask in administration and penal responsibility about failure of the duty concerned if we perform the Notifecations concerned by October 30, 2020 when we cannot report change based on regulations of Construction Recycling Law Article 25 Paragraph 1 and Article 27 Paragraph 1 by heavy rain in July, 2020.

(coming thing is best as for time limit when you should perform Notifecations between R2.7.3 - R2.10.29.)

 


 

 

 

We relate to this page
Inquiry
(ID: 75989)
Saga prefectural government office (corporation number 1000020410004) 〒 840-8570  1-1-59, Jonai, Saga-shi   Tel: 0952-24-2111 (main)     
Copyright© 2016 Saga Prefecture.All Rights Reserved.

Saga prefectural government office (corporation number 1000020410004)

〒840-8570
1-1-59, Jonai, Saga-shi
Tel: 0952-24-2111 (main)
Copyright© 2016 Saga Prefecture.All Rights Reserved.