To the Saga Kyushu Shinkansen TOP synthesis topTo the Saga Kyushu Shinkansen TOP synthesis top
Saga Kyushu ShinkansenSaga Kyushu Shinkansen (smartphone version)
Background color BlueBlackWhite
Size ExpansionNormal

[topics] About the remark point as Saga in "the ruling party maintenance Shinkansen construction promotion project team Kyushu Shinkansen (West Kyushu route) Exploratory Committee"

The last update date:

About technology development of July 28, 2017, free gauge train "is considered ruling party maintenance Shinkansen construction promotion project team Kyushu Shinkansen (West Kyushu route)

Committee meeting was held, and hearing was carried out for both Saga, Nagasaki.  

 

The remark point as Saga

  • Realization of six person agreements (the opening of business by relay method of the H34 year, double track between Hizenyamaguchi - Takeo Onsen)
  • Request of discussion for achievement of flow of person from the Kansai China area
  • Environment that we can discuss from the viewpoint of Saga burden does not have about maintenance in full standard

 PDF Saga hearing material We open with the other window(PDF: 350.7 kilobytes)


 

 

We relate to this page
Inquiry
(ID: 57966)
Saga   Department of Regional Exchange  Traffic Policy Division   〒 840-8570   1-1-59, Jonai, Saga-shi   TEL: 0952-25-7341 FAX: 0952-25-7142

Copyright© 2016 Saga Prefecture.All Rights Reserved. Saga

Saga Department of Regional Exchange traffic Policy Division

〒840-8570  1-1-59, Jonai, Saga-shi
TEL: 0952-25-7341
FAX: 0952-25-7142
Copyright© 2016 Saga Prefecture.All Rights Reserved.