To the Saga Kyushu Shinkansen TOP synthesis topTo the Saga Kyushu Shinkansen TOP synthesis top
Saga Kyushu ShinkansenSaga Kyushu Shinkansen (smartphone version)
Background color BlueBlackWhite
Size ExpansionNormal

Process of Kagoshima route

The last update date:
To homepage of Saga To homepage of Saga
 

Process from basic plan determination of Kagoshima root to whole line opening

          June 29, 1972

 Country decides basic plan of Kyushu Shinkansen Kagoshima route

          November 13, 1973

 Country decides maintenance planWith new window of Kyushu Shinkansen Kagoshima route

          August 22, 1991

 We start construction, and Kagoshima route (Yatsushiro - Nishikagoshima interval) authorizes

          September 7, 1991

 Kagoshima route (Yatsushiro - Nishikagoshima interval) construction groundbreaking ceremony

          March 12, 1998

 We start construction, and Kagoshima route (boathouse - Yashiro Atarashi) authorizes 

          March 21, 1998

 Kagoshima route (boathouse - Yashiro Atarashi) construction groundbreaking ceremony

          April 25, 2001

 We start construction, and Kagoshima route (Hakata - Yashiro Atarashi) authorizes

          June 2, 2001

 Kagoshima route (Hakata - Yashiro Atarashi) construction groundbreaking ceremony

          March 13, 2004

 The opening of business between Kyushu Shinkansen Kagoshima route Yashiro Atarashi - Kagoshima Chuo

          March 12, 2011      

 Kyushu Shinkansen Kagoshima route whole line opening

We relate to this page
Inquiry
(ID: 9676)
Saga   Department of Regional Exchange  Traffic Policy Division   〒 840-8570   1-1-59, Jonai, Saga-shi   TEL: 0952-25-7341 FAX: 0952-25-7142

Copyright© 2016 Saga Prefecture.All Rights Reserved. Saga

Saga Department of Regional Exchange traffic Policy Division

〒840-8570  1-1-59, Jonai, Saga-shi
TEL: 0952-25-7341
FAX: 0952-25-7142
Copyright© 2016 Saga Prefecture.All Rights Reserved.